Business Process Visual ARCHITECT 2.0 SP1 Release Notes

Release Date: March 5, 2007

Modeling collaboratively with CVS

Concurrent Versions System (CVS) is a popular version control system that store artifacts centrally and keep track of changes and histories. All Visual Paradigm client products are integrated with CVS to facilitate collaborative modeling. Your team can use CVS repository to store project files, keep track of changes and perform modeling concurrently.

Modeling collaboratively with Subversion

Subversion (SVN) is a popular version control system that store artifacts centrally and keep track of changes and histories. All Visual Paradigm client products are integrated with Subversion to facilitate collaborative modeling. Your team can use Subversion repository to store project files, keep track of changes and perform modeling concurrently.

Textual Analysis Enhancements

Textual Analysis is a useful technique for identifying candidate objects from a textual representation of users' problem. In previous versions, it is possible to extract candidate actors, classes, use cases, and work flows from problem statement. Starting from this version onwards, the Textual Analysis feature is improved such that more kinds of candidate objects can be extracted from the problem statement. They include BPMN objects such as Task and Sub-process.

Element Sorting in Report Generation

Element sorting is always essential in modeling. Take the various diagram and model trees as example. One can easily locate an element from Model Tree if the listing of elements follows certain order such as by type or by name in alphabetical order. As representation of models, element sorting in report is as important as that in modeling.
Visual Paradigm supports different way of sorting the elements in generated report. The sorting will affect the sequence of elements appear in the PDF, HTML and Word report.

Group Diagram by Category

Visual Paradigm supports a broad range of diagrams that suit different kind of users, and thus different modeling needs. The types of diagrams that Visual Paradigm supports can be generally categorized into UML Diagrams, Requirements Capturing, Database/Data Modeling, Business Process Modeling and Others.

Enhanced Business Process Report Generation

In Business Process Diagram, participants can be defined for a messages to represent the sender and receiver of that message. In the previous version, the information of participant was not appear in generated reports. But from now on, participants will be shown as a separate model under the Detail section in generated report.

Optionally include Diagram Summary in Report Generation

Diagram Summary here refers to the table blocks shown in a generated report. A diagram summary table lists out the models that appear on a diagram, and provides linkage to them. While the summary table provides fast access to models, it may not be desired, especially for users who have certain predefined rules that guide the layout of reports. Now, it is possible to make the generated HTML, PDF and Word reports not to include the summary table.

  • Supported finding models by tagged values
  • Supported Hungarian in PDF report
  • Supported presenting file types in different ways such as "*.doc", "doc"
  • PDF report failed to wrap the content in tables
  • Details section still shows in HTML and PDF report even none of the details have been selected to included in the report
  • HTML report summary link does not work if Shape Type = 'Text'
  • Word Report unable to apply font selection for header and footer
  • Project Publisher does not publish models Comment
  • Documentation written in Document Info Shape not appear in HTML report's image
  • BP message's documentation is not included in generated reports
  • Project corruption caused by autosave
  • Project import does not preserve RTF model documentation
  • Unable to show full gateway caption if it is put left of the gateway
  • Subprocess in Unspecified type wrongly set to Embedded after reopening project
  • Unable to connect to Start event that attach to the boundary of a Sub-process
  • Project export discarded Visio shape contained in the diagram
  • Wrong position of element name label by importing Rose model
  • Incorrect Online Help download link
  • Note objects failed to wrap its content
  • Opening a project under a workspace with default pin option on would cause the connect to route irregularly
  • Duplicating pool with lane produces corrupted elements
  • Font for lane follows the format of pool, not the lane itself
  • Property pane missing the support of image and linked file choices for image shapes
  • Exporting and importing project cause the reorder the diagrams
  • Sequence diagram generated by creating scenario unable to show operations as messages
  • Association in BPMN diagram not show as dotted line
  • Exported XML missing shape formatting
  • Copy and paste diagram that contain image shape as EMF cause the image shape to disappear
  • Various problems related to undo and redo