Working with teamwork client dialog box with CVS

To perform teamwork operations such as to commit or update project, you can click the buttons in application menus or toolbars. Besides, you can perform via the Teamwork Client dialog box. Teamwork Client dialog box enables you to perform teamwork operations, manage teamwork projects, as well to review and checkout revisions of particular project.

Opening the teamwork client

  1. Open the Teamwork Client by either of the ways below:
    • Select Teamwork > Open Teamwork Client... from the main menu.
    • Click on the button Open Teamwork Client in toolbar.
      Open teamwork client through toolbar
      Open teamwork client through toolbar
  2. In the login dialog box, fill in the server and user information to login to server.
    Login teamwork server
    Login CVS
    Below is a description of fields in the Login dialog box:
    Field Description
    Server The type of server, which should be CVS
    Server host The server host, which can be host name or IP address
    Port number The port of connecting to server
    User name The user name for connecting to server
    Password The password for given user
    Remember password Check to memorize the password so that you don't need to enter again
    Use proxy Check if proxy is needed for connecting to server. When checked, you will need to enter proxy host.
    Description of Login dialog box
  3. If this is the first time you connect to the CVS server, you will be asked to select the projects to manage. By managing a project, you can check it out, open and edit it. In the Manage Project dialog box, select the projects to manage.
    Select projects to manage
    Select projects to manage
  4. Click on the > button in the middle of the dialog box to add them into project selection.
  5. Click OK to proceed. This end up showing the Teamwork Client dialog box.
    The Teamwork Client dialog box
    The Teamwork Client dialog box

The interface

General

The Teamwork Client dialog box
The Teamwork Client dialog box
Region Description

To logout from CVS server.

To login to CVS server.
To manage projects, which enables you to add or remove projects from the list of managed projects.
To create a project in server by importing one into it. You may create a blank new project, or import an existing project file to start with.
To update changes from server.
To commit changes to server.
To checkout a project from server.
To open the project selected in Projects list. If the project is not checked out yet, it will be checked out automatically.
To remove changes made in a revision.
To check for changes
To create a tag for a trunk/branch.
To create a branch for a trunk/branch.
To merge changes from trunk/branch.
To switch to another trunk/branch/tag.
To remove a branch. Note that removed branch will not delete the, but just make it not accessible.
Show all user To show the projects manageable by all users.
Repository To update the Projects list by showing only projects in certain repository.
Projects The list of manageable project.
Project Details Details of selected project, including the name, revision and status.
Revisions Revisions of selected project.

Description of the Teamwork Client dialog box

Project details

The Project Details tab in Teamwork Client dialog box
The Project Details tab in Teamwork Client dialog box
Field Description
Project name Name of the selected project.
File path The file path of the project in your system.
Checkout time The time when you checkout the project.
Revision The revision of your local copy.
Status The status of local project.
Comment The comment of project entered by the administrator when creating project.

Description of Project Details tab in Teamwork Client dialog box

Revisions

The Revisions tab in Teamwork Client dialog box
The Revisions tab in Teamwork Client dialog box
Region Description
Show:
To list certain amount of revisions, such as all, last 10, last 20, etc.
Revision list To display the revisions of chosen project.
[Revert] By reverting a selected revision, this means to undone changes made in that revision.
[Export] To export selected revision(s) as project files.
[Open] To open selected revision.
[Compare] To compare the differences between revisions.

Description of Revisions tab in Teamwork Client dialog box

 

 
Chapter 3. Team Collaboration with CVS Table of Contents 2. Importing projects to CVS server
 

Product

Try this feature with

Visual Paradigm for UML

Technical Support

Have technical issues or suggestions? Please contact Visual Paradigm Support Team.

Sales Support

Have questions related to registration, licensing or payment? Feel free to contact Visual Paradigm Sales Team.

Discussion Forum

Share your suggestions of opinions at VP Discussion Forum.