Rather than managing Scrum activities through disconnected spreadsheets, meeting notes, task lists, and manually maintained reports, teams can use the Scrum Process Canvas to organize their work around a structured, repeatable process while keeping important project information connected.
What Is Scrum Process Canvas?
Scrum Process Canvas is a built-in Scrum project management tool in Visual Paradigm Desktop. It provides a one-page visual overview of Scrum activities and allows team members to open individual work items, follow guided instructions, complete project activities, and manage the information associated with each stage of a Scrum project.
The canvas acts as a central navigation point for the Scrum process. Instead of requiring users to remember which document or tool contains a particular piece of information, it organizes activities into a connected workflow. Selecting a work item opens its instructions and associated steps. Each step may contain action artifacts such as tables, diagrams, meeting forms, charts, or other project management resources.
Information collected through these activities can be reused by other parts of the Scrum process and compiled into reports. This helps teams maintain consistency and traceability throughout the project.
How Scrum Process Canvas Fits into Visual Paradigm Desktop
Visual Paradigm Desktop is a visual modeling and project development environment supporting UML, BPMN, enterprise architecture, database design, Agile management, and other disciplines. Scrum Process Canvas extends this environment into Scrum project planning and management.
It is particularly useful when a software development team needs to connect business requirements with user stories, sprint planning, development tasks, and product delivery. For example, business goals can be represented using use case models, decomposed into epics and user stories through a User Story Map, and subsequently organized into product and sprint backlogs.
The Scrum Process Canvas is therefore more than a visual Scrum checklist. It is a structured project management environment that connects requirements, planning, execution, monitoring, collaboration, and documentation.
Why Use Scrum Process Canvas?
Scrum Process Canvas helps teams reduce the administrative effort involved in managing Scrum projects while improving the consistency, visibility, and traceability of project information.
Manage the Entire Scrum Workflow in One Place
Scrum projects involve many related activities, including project initiation, product backlog refinement, sprint planning, daily Scrum meetings, progress tracking, sprint reviews, and retrospectives. When these activities are managed using separate tools and documents, important information can become fragmented.
The canvas provides a central workspace from which team members can access these activities and their associated resources. This makes it easier to understand the overall project workflow and locate the information needed for each activity.
Reduce Repetitive Administrative Work
Many Scrum management activities require maintaining records, updating task information, preparing meeting documentation, and generating progress reports. Scrum Process Canvas provides structured forms, tables, and reporting facilities to reduce repetitive manual work.
For example, the burndown chart is generated from sprint task estimates and progress information, while completed work items can produce reports that are archived in the Scrum Cabinet.
Improve Consistency Across Scrum Activities
Without a structured process, different team members may record similar information in different formats or overlook important activities. Scrum Process Canvas provides predefined work items and guided steps to help teams follow a consistent approach.
Teams can use shared criteria, standardized meeting records, and structured backlog information to establish a more consistent way of working.
Connect Requirements with Development Work
One of the important advantages of Scrum Process Canvas is its integration of business goals, epics, user stories, sprint backlogs, and development tasks. This helps teams understand how planned development activities relate to the business requirements they are intended to satisfy.
It also makes it easier to review the original acceptance criteria when evaluating completed user stories.
Improve Project Visibility and Decision-Making
Scrum masters, product owners, developers, and stakeholders need different views of project progress. Scrum Process Canvas provides backlog information, sprint task status, burndown charts, impediment records, and completion indicators that help teams understand the current state of their work.
Preserve Project Knowledge and History
Meeting records, work item reports, sprint information, and project retrospectives help preserve decisions and lessons learned. Teams can revisit previous sprint information and retrieve generated documents instead of relying entirely on individual team members’ memories or scattered files.
What Happens Without a Centralized Scrum Workspace?
Teams can certainly manage Scrum projects using spreadsheets, documents, task management applications, and meeting software. However, this approach often introduces additional coordination work and information management risks:
- Fragmented information: Product requirements, sprint tasks, meeting notes, and progress reports are maintained in separate locations.
- Inconsistent records: Different team members may use different formats for documenting user stories, impediments, and meeting outcomes.
- Manual progress reporting: Teams may need to repeatedly consolidate task information and calculate progress manually.
- Weak requirement traceability: It can be difficult to connect business goals to the user stories and tasks that implement them.
- Lost project knowledge: Important decisions and retrospective findings may become difficult to retrieve after meetings or sprint completion.
- Higher coordination overhead: Scrum masters and product owners spend more time collecting and reconciling information instead of helping the team deliver value.
Scrum Process Canvas addresses these challenges by providing an organized environment for managing the activities and information associated with a Scrum project.
Edition and Availability
Scrum Process Canvas is available in Visual Paradigm Desktop Professional Edition and Enterprise Edition, according to the Visual Paradigm edition comparison.
The Standard, Modeler, and Community editions do not list the Scrum Process Canvas feature in the current edition comparison. Users should consult the latest official edition matrix to confirm availability, particularly if edition packaging or licensing arrangements change.
| Visual Paradigm Desktop Edition | Scrum Process Canvas |
|---|---|
| Enterprise | Available |
| Professional | Available |
| Standard | Not listed as available |
| Modeler | Not listed as available |
| Community | Not listed as available |
In addition to the edition requirement, opening Scrum Process Canvas involves connecting to a VP Online workspace or setting up a local workspace. Users can sign in to an existing workspace, create a VP Online workspace, or use the Local Workspace setup option where available.
For detailed licensing and edition information, refer to the Visual Paradigm Edition Comparison.
How to Open Scrum Process Canvas
You can open Scrum Process Canvas directly from Visual Paradigm Desktop through the Agile menu.
- Launch Visual Paradigm Desktop.
- Open the Agile menu on the application toolbar.
- Select Scrum Canvas.
- If prompted, connect to an existing VP Online workspace, sign up for a new workspace, or select the local workspace setup option.
- After the workspace connection or setup is completed, Scrum Process Canvas will open.
- Click an individual work item on the canvas to explore its activities and supporting resources.
The canvas provides access to the Scrum project’s work items. Each work item represents an activity or management area, such as identifying project vision, managing user stories, planning a sprint, or recording a retrospective.
Scrum Process Canvas Functionality Breakdown
Scrum Process Canvas provides a collection of integrated capabilities covering the major stages of Scrum project management. Its functionality can be understood through the following areas.
Visual Scrum Process Navigation
The central canvas presents Scrum activities as individual work items in an organized visual layout. It provides a high-level view of the process and acts as the starting point for accessing specific activities.
- One-page process overview: View the Scrum workflow from a central canvas rather than navigating through unrelated documents.
- Work item navigation: Click a work item to open its activity details and associated steps.
- Guided instructions: Follow the instructions provided for each activity to understand what information needs to be collected or what action needs to be performed.
- Action artifacts: Open associated resources such as diagrams, tables, meeting records, and reports.
- Process progress: Use the work item workflow to keep track of activities and their completion.
- Contextual navigation: Return to the work item or main canvas through the available breadcrumb navigation.
Depending on the work item, an activity may involve completing a form, editing a table, creating a diagram, reviewing a chart, or generating a report.
Project Initiation and Scrum Team Management
The project initiation activities help establish the foundation of a Scrum project before the team begins managing its product backlog and development iterations.
Project Vision, Mission, and Objectives
Teams can document the overall direction and purpose of the project through project initiation activities. The project vision communicates the intended product outcome, while the mission and objectives provide additional context about what the project aims to achieve.
This information gives the Scrum team a shared understanding of the product and the value it is intended to deliver.
Product Owner Appointment
The Product Owner represents the interests of customers and stakeholders and is responsible for guiding product direction and backlog priorities. Scrum Process Canvas provides an activity for appointing and recording the Product Owner.
Scrum Master Appointment
The Scrum Master facilitates the Scrum process, supports team collaboration, and helps address impediments. The project initiation workflow includes an activity for identifying the Scrum Master.
Scrum Team Formation
The Scrum Team activity allows the project to maintain a record of its members and their responsibilities.
- Select members who have been added to the project workspace.
- Record each member’s responsibilities within the project.
- Add notes or additional information about individual members.
- Maintain a list of team members who contribute to product development.
This helps establish a shared understanding of team composition and responsibilities.
Stakeholder Identification
Teams can identify stakeholders who interact with the Product Owner or provide input into product direction. Recording stakeholder information helps the team understand who should be consulted or involved in relevant project activities.
Business Goal Identification and Product Backlog Management
Product backlog management is one of the central capabilities of Scrum Process Canvas. It helps teams translate business goals into increasingly detailed and actionable product requirements.
Identify Business Goals with Use Case Models
Teams can use use case modeling to represent the business goals and functionality that the product needs to support.
- Identify important business goals and user interactions.
- Represent the goals using a use case diagram.
- Maintain a tabular overview of use cases through the ETL Table.
- Describe individual use cases.
- Record priority, size, and complexity information.
- Use the identified business goals as a foundation for subsequent backlog refinement.
The use case model provides a visual representation of what the product needs to accomplish, while the associated table makes it easier to review and compare the identified business goals.
Manage Epics
Epics represent larger areas of functionality or high-level requirements that can be decomposed into smaller user stories.
The User Story Map allows teams to organize epics under the corresponding business goals or use cases. It also provides general activity and general epic areas for functionality that does not naturally belong to a specific use case.
Teams can:
- Create epics under identified use cases.
- Rename epics to reflect the intended functionality.
- Organize epics within the User Story Map.
- Describe individual epics.
- Record priority and risk information.
- Review and refine epics as requirements become clearer.
Create and Organize User Stories with User Story Map
The User Story Map provides a visual way to organize user activities, epics, and user stories. It helps teams understand how smaller requirements contribute to larger product functionality.
Its capabilities include:
- Hierarchical organization: Organize user activities, epics, and user stories into a structured map.
- Story creation: Add user stories under the relevant epics.
- Inline editing: Edit story names and information directly in the map.
- Drag-and-drop arrangement: Reorganize stories and arrange them into release partitions.
- Cross-activity continuity: Reuse the stories identified in the map when working with the prioritized product backlog and sprint planning activities.
A User Story Map is particularly useful for understanding the relationship between user activities, high-level functionality, and individual development requirements.
Prioritize the Product Backlog
The prioritized product backlog provides a tabular view of user stories, making it easier to review, describe, estimate, and prioritize requirements.
Teams can maintain information such as:
- Story description: Describe the requirement, commonly using the format “As a [role], I want [goal], so that [benefit].”
- Acceptance criteria: Define the conditions that must be satisfied for a particular story to be accepted.
- Story points: Estimate the relative size and complexity of a user story.
- Priority: Indicate the relative importance of a story and its business value.
- Risk: Record the uncertainty associated with successfully completing a story.
- Due date: Record a target date when relevant.
- Status: Identify the approval state of a user story.
The tabular view makes it easier to review many stories consistently. A smart filter also helps users focus on incomplete stories.
Define Project-Level Done Criteria
Scrum Process Canvas supports the definition of Done Criteria that apply across user stories in a project. These criteria describe the common conditions that must be satisfied before a story can be considered complete.
Project-level Done Criteria are different from individual acceptance criteria:
- Done Criteria: Shared completion requirements that apply to all user stories in the project.
- Acceptance Criteria: Specific conditions that an individual user story must satisfy to be accepted.
Using both helps teams establish consistent quality expectations without losing the ability to define story-specific requirements.
Approve User Stories for Sprint Planning
After reviewing and detailing a user story, the Product Owner can mark it as Approved. Approved stories are sufficiently detailed and ready to be considered for sprint planning.
An important workflow rule is that only user stories in the Approved state are available for selection when creating the sprint backlog. This helps prevent insufficiently refined requirements from being included in a sprint inadvertently.
Release Planning and Deliverable Management
Scrum Process Canvas supports release planning so that teams can organize user stories into planned product releases and maintain an overview of expected deliverables.
Release Configuration
Teams can define project releases and maintain information about each release, including its name, description, intended scope, and planned release date.
Arrange User Stories into Releases
The User Story Map provides a visual way to allocate user stories to releases. Teams can drag stories into the appropriate release partitions to organize planned product functionality.
Release assignments can be reviewed and adjusted as the product backlog evolves.
Manage Project Deliverables
Deliverable management provides a structured list of the products, services, or other outcomes expected during the project.
For each deliverable, teams can record information such as:
- Deliverable name and description.
- Requirements or scope associated with the deliverable.
- Planned release date.
- Priority.
- Responsible owner.
- Related user stories.
- Delivery status.
This gives the team a clearer understanding of what needs to be produced, when it is expected, and which requirements contribute to its creation.
Sprint Management and Planning
Sprint management capabilities help teams convert approved product backlog items into a focused set of development activities for a time-boxed iteration.
Create and Switch Sprints
The Create / Switch Sprint work item provides access to sprint creation and sprint selection.
- Create a new sprint.
- Assign a meaningful sprint name.
- Specify the sprint start and end dates.
- Set the newly created sprint as the active sprint.
- Switch to an earlier sprint to review its information and history.
When a sprint becomes active, sprint-related activities and information are associated with that sprint. This makes it possible to manage multiple iterations while preserving their individual records.
Conduct Sprint Planning Meetings
The sprint planning activity helps the team document the planning process, including meeting arrangements, agenda topics, decisions, and selected work.
Meeting information can include:
- Meeting date and time.
- Participants and observers.
- Agenda topics.
- Required resources.
- Discussion notes and conclusions.
Create the Sprint Backlog
The sprint backlog identifies the approved user stories that the team intends to complete during the active sprint.
Using the sprint backlog interface, the team can review available approved stories and select those that fit the sprint goal and available capacity.
This provides a focused list of requirements that the team has committed to work on during the iteration.
Break User Stories into Development Tasks
After selecting stories for a sprint, the team can decompose them into smaller development tasks. This helps translate user requirements into actionable work that can be assigned and tracked.
Task information can include:
- Task name.
- Task description.
- Responsible team member.
- Target completion date.
- Estimated effort.
Effort estimates are expressed numerically, allowing the team to use a consistent unit such as hours or days according to its preferred estimation approach.
Maintaining tasks under their associated user stories helps preserve the relationship between development work and the requirements being implemented.
Define Sprint Deliverables
Teams can record the deliverables expected from the active sprint, describe their requirements, identify responsible team members, and associate the deliverables with the user stories that contribute to them.
This helps connect sprint commitments with the actual outputs that will be demonstrated during the sprint review.
Daily Scrum Meeting Management
Scrum Process Canvas provides a structured way to prepare and record Daily Scrum meetings throughout a sprint.
Each Daily Scrum record can capture:
- Meeting information: Date, time, and participating team members.
- Works Done: Work completed by each member since the previous meeting.
- Works Planned: Work each member intends to complete next.
- Impediments: Obstacles currently affecting progress.
- Action items: Follow-up tasks identified during the meeting.
Multiple Daily Scrum meetings can be recorded within the same sprint. A date selector allows users to create a new meeting record or revisit an earlier one.
Teams can document a meeting before it takes place as preparation or update the record after the meeting to capture the actual discussion and outcomes.
Impediment Log
An impediment is an obstacle that reduces the productivity of the Scrum Team or prevents it from progressing as planned. Scrum Process Canvas provides an impediment log to help Scrum Masters and team members record, assign, and monitor these obstacles.
For each impediment, the team can maintain:
- Impediment summary.
- Detailed description.
- Person who reported the impediment.
- Person responsible for addressing it.
- Current status.
- Reported date.
- Closure date.
- Optional follow-up actions.
This creates a more systematic approach to impediment management. Instead of relying on informal conversations, the team can maintain a record of identified problems, ownership, and resolution progress.
Burndown Chart and Sprint Progress Tracking
The Burndown Chart provides a visual representation of the remaining work in a sprint over time. It helps the team understand whether the sprint is progressing according to its plan.
Automatically Generated Burndown Chart
Scrum Process Canvas generates the initial estimated burndown based on the estimated effort of sprint tasks. The chart is updated as daily progress and task statuses are recorded.
This eliminates the need to manually construct and maintain a separate burndown chart.
Understand Remaining Work
The chart displays remaining work against time, allowing the team to review the rate at which sprint work is being completed.
It can help the Scrum Master and team identify potential schedule risks, discuss unexpected changes in progress, and determine whether additional attention is required.
Task and User Story Completion Indicators
The Scrum Process Canvas also provides task and user story completion figures. These indicators offer a quick overview of how much sprint work has been completed.
Task completion indicates progress at the development activity level, while user story completion provides a higher-level view of delivered requirements.
Scrumboard
The Scrumboard provides a visual overview of sprint tasks organized according to their current status.
The first column lists the user stories included in the sprint. Tasks are then organized into status columns such as In Progress, Completed, and Closed.
The Scrumboard is automatically formed and updated based on sprint task information. This gives the team a convenient way to inspect work distribution and identify outstanding activities without manually constructing a separate board.
Sprint Review and User Acceptance Management
The sprint review capabilities help the team demonstrate completed work, collect stakeholder feedback, and record whether user stories satisfy their acceptance criteria.
Prepare Sprint Review Meetings
Teams can document the sprint review meeting date, time, attendees, and agenda before the review takes place.
Demonstrate Sprint Deliverables
During the review, the team demonstrates the functionality or deliverables produced during the sprint. The Product Owner and relevant stakeholders inspect the work against the requirements and acceptance criteria.
Record User Acceptance
The User Acceptance activity provides a table of the user stories included in the sprint. Team members can inspect the acceptance criteria associated with each story and record the acceptance outcome.
- Review the acceptance criteria for a user story.
- Confirm which criteria have been satisfied.
- Record the story as Done when it is accepted.
- Record the story as Incomplete when it has not been fully accepted.
This connects sprint review outcomes with the requirements defined during product backlog refinement.
Split and Extend User Stories
During a sprint review, stakeholders may identify additional requirements, improvements, defects, or changes that were not covered by the original user story.
The Split and Extend function allows teams to create new user stories based on an existing story. This is useful for capturing:
- Additional functionality discovered during a demonstration.
- Touch-up work or refinements.
- Rework required after stakeholder feedback.
- Bug fixes and corrective work.
- New requirements that should be considered in future sprints.
Rather than losing these findings in meeting notes, teams can capture them as new backlog items for subsequent review and prioritization.
Record Sprint Review Discussions
Teams can document discussion points, conclusions, and the user stories associated with stakeholder feedback. The Product Backlog activity also allows the team to review upcoming requirements and discuss potential work for future sprints.
Sprint Retrospective Management
The sprint retrospective helps the Scrum Team reflect on its working practices and identify improvements for the next iteration.
Scrum Process Canvas provides a structured retrospective workflow based on the Start, Stop, and Continue approach.
Prepare the Retrospective Meeting
Teams can record the meeting date, time, location, participants, observers, resources, and agenda topics.
Start Items
Start Items capture practices, activities, or improvements that the team believes should be introduced in the next sprint.
Stop Items
Stop Items identify practices or activities that are inefficient, ineffective, or no longer useful and should be discontinued.
Continue Items
Continue Items record practices that are working well and should be maintained or reinforced as team best practices.
Voting and Prioritization
After collecting the Start, Stop, and Continue items, team members can vote for the most important improvement areas. The voting results help the team identify which changes deserve the greatest attention during the next sprint.
Record Conclusions and Follow-up Actions
The final retrospective activity captures the discussions and conclusions associated with the meeting agenda. Teams can also create tasks to implement or facilitate the agreed improvements.
This makes the retrospective more actionable by connecting improvement ideas with follow-up work.
Project Retrospective
In addition to sprint-level retrospectives, Scrum Process Canvas supports project retrospective management at the end of a project.
Project retrospectives help the team evaluate the overall project experience and preserve lessons that can improve future projects.
Teams can document:
- Project successes and positive outcomes.
- Challenges and difficulties encountered.
- Project shortcomings and mistakes.
- Recommended solutions and improvements.
- Things the team would do differently in future projects.
- Meeting discussions and conclusions.
- Tasks for addressing identified problems and implementing improvements.
The collected information can be used to generate a Lessons Learned report, helping the organization retain knowledge beyond the lifetime of an individual project.
Scrum Cabinet and Automatic Documentation
Scrum Process Canvas includes a Scrum Cabinet for organizing and retrieving reports generated from completed work items.
Automatic Report Generation
When a work item is completed, reports can be generated from the information collected during its activities and archived in the Scrum Cabinet.
These reports can document information such as meeting agendas, decisions, discussions, and project management records.
Manual Report Generation
Reports can also be generated manually through the Outputs panel of a work item. This allows users to produce available documents when needed without necessarily waiting for the entire work item to be completed.
Browse Archived Documents
The Scrum Cabinet provides a visual filing structure for generated documents. Users can open the relevant cabinet drawer and double-click a report to retrieve and review it.
This makes it easier to maintain an accessible record of Scrum activities and project documentation.
Integration with Task Management
Scrum Process Canvas integrates Scrum planning information with Visual Paradigm’s task management capabilities.
Teams can create tasks from sprint planning, daily Scrum meetings, impediment management, and retrospective activities. Task information can be used to assign responsibility, monitor progress, and manage follow-up actions.
This connection helps ensure that decisions made during Scrum activities can be translated into actionable work rather than remaining only as meeting notes.
User Story Map and Web-Based Collaboration
The User Story Map is integrated into the Scrum Process Canvas workflow and provides a visual way to manage requirements and release planning.
Visual Paradigm also provides web access to its User Story Map capabilities, allowing authorized team members to work with the story map through a web browser. This is useful when team members need to collaborate without relying exclusively on the desktop application.
Web access and workspace permissions are subject to the applicable Visual Paradigm workspace and service arrangements.
How to Use Scrum Process Canvas: A Practical Workflow
The following workflow illustrates how a team can use Scrum Process Canvas to manage a software development project from initiation through delivery.
Step 1: Open the Scrum Process Canvas and Establish the Project
- Open Visual Paradigm Desktop.
- Select Agile > Scrum Canvas.
- Connect to an existing VP Online workspace or configure the local workspace.
- Open the project initiation work items.
- Document the project vision, mission, and objectives.
- Appoint the Product Owner and Scrum Master.
- Form the Scrum Team and record its members and responsibilities.
- Identify the project’s key stakeholders.
Completing these activities establishes the organizational foundation for the Scrum project.
Step 2: Identify Business Goals and Requirements
- Open the business goal identification work item.
- Create a use case model representing the main business goals and product functionality.
- Open the prioritized use cases table.
- Describe each use case and record its priority, size, and complexity.
- Complete the activity and proceed to epic management.
- Open the User Story Map and create epics under the appropriate use cases.
- Describe and prioritize the epics.
This workflow converts high-level business needs into organized product requirements.
Step 3: Build and Refine the Product Backlog
- Open the Manage User Stories work item.
- Define the project-level Done Criteria.
- Open the User Story Map.
- Select an epic and add the user stories required to implement it.
- Describe each user story.
- Open the Prioritized User Stories table.
- Define acceptance criteria for each story.
- Record story points, priority, risk, and due dates where applicable.
- Review the stories with the Product Owner.
- Mark sufficiently refined stories as Approved.
Approved user stories become eligible for selection during sprint planning.
Step 4: Plan Releases and Deliverables
- Open the release planning work item.
- Identify the project’s expected deliverables.
- Configure the planned product releases.
- Enter the release names, descriptions, and planned dates.
- Open the User Story Map.
- Drag user stories into their intended release partitions.
- Review the deliverables, their owners, priorities, and associated requirements.
This provides a high-level view of the product delivery roadmap.
Step 5: Create a Sprint and Conduct Sprint Planning
- Open the Create / Switch Sprint work item.
- Select Create New Sprint.
- Enter a meaningful sprint name.
- Set the sprint start and end dates.
- Return to the main canvas and confirm that the new sprint is active.
- Open the sprint planning work item.
- Record the planning meeting information and agenda.
- Open the Sprint Backlog activity.
- Select the approved user stories that the team intends to complete.
- Open the sprint task management activity.
- Break the selected stories into tasks and record their descriptions, owners, target dates, and estimated effort.
- Define the sprint deliverables and associate them with the relevant stories.
- Record the meeting discussion and decisions.
At the end of this process, the sprint has a defined set of user stories, tasks, estimated effort, and expected deliverables.
Step 6: Execute the Sprint and Record Daily Progress
- Open the Daily Scrum work item.
- Create a record for the current meeting.
- Enter the meeting date, time, and participating members.
- Record each member’s completed work, planned work, and impediments.
- Create follow-up tasks where necessary.
- Update task information as development progresses.
- Open the Impediment Log to record and assign any outstanding obstacles.
- Review the Scrumboard and task completion indicators.
- Open the Burndown Chart to inspect remaining sprint effort.
- Repeat the daily meeting and progress tracking activities throughout the sprint.
This provides an ongoing record of sprint execution and makes it easier to identify problems before they affect delivery.
Step 7: Conduct the Sprint Review
- Open the Sprint Review Meeting work item.
- Record the meeting date, attendees, and agenda.
- Demonstrate the sprint deliverables to the Product Owner and relevant stakeholders.
- Open the User Acceptance activity.
- Review the acceptance criteria for each user story.
- Record each story as Done or Incomplete according to the acceptance outcome.
- Use Split and Extend User Stories to capture additional requirements or rework identified during the review.
- Review the upcoming product backlog items.
- Record stakeholder discussions and conclusions.
The sprint review provides a formal record of what was demonstrated, what was accepted, and what requires further work.
Step 8: Conduct the Sprint Retrospective
- Open the Sprint Retrospective Meeting work item.
- Prepare the meeting and record its agenda.
- Collect Start Items representing improvements the team should introduce.
- Collect Stop Items representing practices the team should discontinue.
- Collect Continue Items representing practices that should be maintained.
- Conduct voting to identify the most important improvement areas.
- Record the meeting discussions and conclusions.
- Create follow-up tasks for the agreed improvements.
The resulting actions can be carried into the next sprint to support continuous improvement.
Step 9: Review Previous Sprints or Start the Next Sprint
When a sprint is finished, the team can create a new sprint or switch to an earlier sprint to review its historical information.
- Open Create / Switch Sprint.
- Select Switch Sprint.
- Choose the sprint to review.
- Inspect its backlog, Daily Scrum records, burndown chart, tasks, and retrospective information.
- Return to the current working sprint when finished reviewing historical information.
Switching sprints makes it possible to inspect earlier iterations without losing their individual records.
Step 10: Generate Reports and Preserve Project Knowledge
- Complete the relevant Scrum work items.
- Open the Scrum Cabinet from the main canvas.
- Browse the cabinet drawers to locate archived reports.
- Double-click a report to open it.
- Where necessary, generate an available report manually through the Outputs panel of the relevant work item.
- At project closure, conduct a project retrospective and generate the Lessons Learned report.
This ensures that important Scrum records and project knowledge remain accessible for future reference.
Important Workflow Concepts and Behaviors
Understanding how Scrum Process Canvas handles work items, steps, commits, and sprint context helps users work with the tool correctly.
Work Items and Action Artifacts
A work item represents a Scrum activity or management area on the canvas. Opening it displays the instructions and steps associated with that activity.
An action artifact is a resource associated with a step. It may open a table, diagram, meeting form, chart, or other interface used to perform the activity.
For example, the Manage User Stories work item contains activities for defining Done Criteria and managing the product backlog. Its action artifacts include the User Story Map and Prioritized User Stories table.
Steps and Step Completion
Some work items are divided into multiple steps. Each step represents a portion of the activity that should be completed before moving forward.
After completing the required actions, users can return to the work item and use the Complete Step control to mark the step as complete. The workflow can then proceed to the next step.
Commit Changes Only Versus Complete
Scrum Process Canvas distinguishes between saving ongoing changes and completing an activity.
- Commit Changes Only: Saves the changes made so far while keeping the current step active. This is useful when information is still evolving or additional meetings will be conducted.
- Complete: Commits the information and marks the relevant activity or step as completed so the workflow can proceed.
For example, when managing the product backlog, new requirements may continue to appear. Users can commit changes without completing the activity, allowing the backlog to remain open for further refinement.
Similarly, Daily Scrum records can be committed while a sprint is ongoing. The activity can be completed when no further Daily Scrum meetings are expected in that sprint.
Active Sprint Context
Sprint-related activities operate within the context of the active sprint. Creating a new sprint automatically makes it the active sprint, and subsequent sprint information is associated with it.
Switching to an earlier sprint changes the context used when viewing sprint-related information. Users should remember to switch back to the current working sprint before continuing active project work.
Relationship Between Backlog Approval and Sprint Selection
Not every user story in the product backlog is immediately available for sprint planning. A story must first be sufficiently detailed and marked Approved before it becomes available for selection in the sprint backlog.
This distinction helps separate general product ideas and requirements under refinement from stories that are ready to be considered for implementation.
Automatic Updates Versus Manual Updates
Some Scrum Process Canvas information is derived from other project records, while other information must be entered by users.
- The Scrumboard is automatically formed and updated based on sprint tasks and their statuses.
- The burndown chart is generated from task estimates and updated based on recorded progress.
- Task and user story completion indicators reflect the progress recorded in the project.
- Meeting records, acceptance outcomes, impediments, and retrospective findings require users to enter or update the relevant information.
- Reports are generated from the information collected under their associated work items.
Automatic visualization does not eliminate the need to maintain accurate source information. The quality of progress indicators depends on timely and correct task updates.
Best Practices for Using Scrum Process Canvas
Establish a Clear Definition of Done
Define project-level Done Criteria early and make sure the team understands them. This creates a shared quality baseline and reduces disagreements about whether a story is complete.
Write Specific and Testable Acceptance Criteria
Acceptance criteria should describe observable conditions that can be checked during sprint review. Avoid vague statements that make it difficult for the Product Owner and developers to agree on acceptance.
Keep the Product Backlog Refined
Regularly review story descriptions, acceptance criteria, priorities, estimates, and approval status. Well-refined stories make sprint planning more efficient and reduce misunderstandings during development.
Break Stories into Actionable Tasks
Create tasks that are sufficiently specific for team members to understand the work required. Record realistic effort estimates and assign responsibility where appropriate.
Update Task Status Regularly
Maintain accurate task status information throughout the sprint. Since the Scrumboard and burndown chart depend on recorded project progress, delayed updates can make the displayed information misleading.
Use the Impediment Log Proactively
Record obstacles as soon as they are identified. Assign an owner, maintain the status, and update the closure date when the issue is resolved. This prevents important blockers from being forgotten.
Record Daily Scrum Outcomes Consistently
Capture meaningful information about completed work, planned work, and impediments. Use follow-up tasks for actions that require additional attention after the meeting.
Distinguish Incomplete Stories from New Requirements
During sprint review, record whether an existing story is accepted or incomplete. Use Split and Extend when additional work or requirements need to be captured as new backlog items.
Turn Retrospective Findings into Actions
A retrospective is valuable only when the team acts on its conclusions. Prioritize a manageable number of improvements and create follow-up tasks to make them part of the next sprint’s work.
Use Sprint Switching Carefully
When reviewing historical sprint information, verify which sprint is active before editing records. Return to the current sprint after the review to avoid accidentally working in the wrong sprint context.
Generate and Review Documentation Regularly
Use the Scrum Cabinet to retrieve generated records and confirm that important project decisions and outcomes have been documented. Reports can also help stakeholders understand project progress without requiring them to inspect every work item.
Who Should Use Scrum Process Canvas?
Scrum Process Canvas supports the different participants involved in planning, executing, and managing a Scrum project.
| Role | How the Role Uses Scrum Process Canvas |
|---|---|
| Product Owner | Defines product direction, identifies business goals, manages backlog priorities, refines user stories, defines acceptance criteria, and reviews delivered functionality. |
| Scrum Master | Facilitates Scrum activities, manages impediment records, monitors sprint progress, supports team collaboration, and facilitates retrospectives. |
| Developers | Review user stories, participate in sprint planning, define and execute tasks, report daily progress, and demonstrate completed work. |
| Business Analysts | Help identify business goals, develop use case models, organize requirements, and refine epics and user stories. |
| UX Designers | Contribute to user requirements, user activities, product functionality, and the refinement of stories that involve user experience. |
| Project Managers | Review release plans, deliverables, sprint information, progress indicators, and project documentation. |
| Stakeholders | Provide input during product reviews, inspect deliverables, evaluate acceptance criteria, and contribute to product direction. |
The exact responsibilities depend on the team’s working agreement and project structure. Scrum Process Canvas provides a shared information environment rather than prescribing every organization’s internal role assignment.
Scrum Process Canvas vs. Spreadsheets and Disconnected Tools
Scrum Process Canvas is designed to connect Scrum activities and their supporting information. Compared with managing the same process through independent spreadsheets and documents, it provides a more integrated workflow.
| Management Area | Disconnected Tools | Scrum Process Canvas |
|---|---|---|
| Project workflow | Activities are distributed across separate documents and applications. | Scrum activities are organized in a central visual process canvas. |
| Requirements | Business goals, epics, and stories may be maintained separately. | Use cases, epics, and user stories are connected through the backlog workflow and User Story Map. |
| Backlog refinement | Priority, estimates, and acceptance criteria may be spread across multiple files. | Story information can be reviewed in a structured backlog table. |
| Sprint planning | Stories and tasks may require manual consolidation. | Approved stories can be selected for a sprint and decomposed into estimated tasks. |
| Daily Scrum | Meeting notes may be stored in separate documents. | Daily Scrum records are maintained within the active sprint. |
| Progress tracking | Charts and status boards may require manual maintenance. | Burndown charts and Scrumboards are generated from recorded sprint information. |
| Impediment management | Issues may be tracked informally or in unrelated lists. | A dedicated impediment log records ownership, status, and resolution information. |
| Sprint review | Acceptance outcomes may be recorded separately from requirements. | User acceptance is recorded against the relevant stories and acceptance criteria. |
| Retrospectives | Findings may remain in meeting notes. | Start, Stop, Continue items, voting results, and follow-up tasks can be documented. |
| Documentation | Reports need to be manually assembled and organized. | Available work item reports can be generated and archived in the Scrum Cabinet. |
The primary advantage is not simply having more Scrum management features. It is having a structured environment in which related information can be created, reused, reviewed, and documented as the project progresses.
Limitations and Important Considerations
Although Scrum Process Canvas provides extensive Scrum management capabilities, users should understand its intended scope and some important operational considerations.
It Supports Scrum Management Rather Than Replacing Every Development Tool
Scrum Process Canvas helps teams organize requirements, planning, meetings, tasks, and progress information. It does not mean that every software development activity, such as source code management, automated testing, deployment, or production monitoring, is performed inside the canvas.
Accurate Progress Tracking Depends on Timely Updates
Automatically generated progress views depend on the underlying task estimates and status information. If team members do not maintain their task records, the Scrumboard and burndown chart may not accurately reflect the actual state of development.
Approved Stories Are Required for Sprint Backlog Selection
Stories that are still being refined or have not been approved are not available for selection in the sprint backlog. Teams should maintain their approval workflow and ensure that candidate stories are sufficiently detailed before sprint planning.
Workspace Setup Is Required
Opening Scrum Process Canvas involves configuring or connecting a VP Online workspace or using the available local workspace setup. Users should follow the workspace connection or setup instructions presented by the application.
It Does Not Automatically Make Scrum Decisions
Scrum Process Canvas provides structured interfaces, visual indicators, and reporting facilities. Decisions about product priorities, sprint commitments, acceptance, impediment resolution, and process improvements still require human judgment and team collaboration.
Edition Availability Should Be Verified
Scrum Process Canvas is listed for Professional and Enterprise editions in the published edition comparison. Organizations should verify the current edition matrix and workspace requirements before purchasing or upgrading.
Frequently Asked Questions About Scrum Process Canvas
What is Scrum Process Canvas in Visual Paradigm?
Scrum Process Canvas is an integrated Scrum project management tool in Visual Paradigm Desktop. It provides a one-page visual workflow for managing project initiation, product backlog refinement, sprint planning, Daily Scrum meetings, impediments, progress tracking, sprint reviews, retrospectives, releases, and project documentation.
Is Scrum Process Canvas available in Visual Paradigm Desktop?
Yes. Scrum Process Canvas is available in Visual Paradigm Desktop Professional and Enterprise editions according to the published edition comparison.
How do I open Scrum Process Canvas?
In Visual Paradigm Desktop, select Agile > Scrum Canvas. You will then be prompted to connect to a VP Online workspace, create a workspace, or configure the available local workspace option.
Do I need a VP Online account to use Scrum Process Canvas?
The opening workflow provides options to sign up for a VP Online workspace, log in to an existing account, or configure a Local Workspace for evaluation. Therefore, users are not necessarily required to create an online workspace if they choose the available local setup option.
What is the purpose of the one-page Scrum Process Canvas?
The one-page canvas provides a central visual overview of Scrum activities. It allows users to navigate to work items, follow guided steps, open associated resources, and manage the different stages of a Scrum project from one location.
What is a work item in Scrum Process Canvas?
A work item is a visual element on the canvas representing a Scrum activity or management area. Examples include Manage User Stories, Daily Scrum, Impediment Log, Burndown Chart, and Sprint Retrospective Meeting.
What are action artifacts?
Action artifacts are the supporting resources associated with work item steps. They can open tables, diagrams, forms, charts, or other interfaces that allow users to perform the required activity.
Can I manage the entire Scrum project with Scrum Process Canvas?
Scrum Process Canvas supports a broad range of Scrum project activities, from project initiation and product backlog management to sprint execution, review, retrospective, release planning, and documentation. It provides an integrated environment for these activities, although specialized development tools may still be needed for coding, version control, automated testing, and deployment.
Can I create a product backlog in Scrum Process Canvas?
Yes. You can identify business goals using use case models, organize epics and user stories in the User Story Map, and manage story descriptions, acceptance criteria, story points, priority, risk, due dates, and approval status through the prioritized product backlog.
What is the relationship between use cases, epics, and user stories?
Use cases represent business goals or product interactions. Epics represent larger areas of functionality associated with those goals. User stories break epics into smaller requirements that can be reviewed, prioritized, estimated, and selected for implementation in a sprint.
Can Scrum Process Canvas generate a User Story Map?
Yes. The integrated User Story Map allows teams to organize user activities, epics, and user stories visually. It supports story creation, editing, drag-and-drop organization, and allocation of stories to release partitions.
Can I define acceptance criteria for user stories?
Yes. The Prioritized User Stories interface allows users to define acceptance criteria for individual stories. These criteria are subsequently used during sprint review and user acceptance management.
What is the difference between Done Criteria and acceptance criteria?
Done Criteria are shared completion requirements that apply to all user stories in a project. Acceptance criteria are specific conditions that must be satisfied for an individual user story to be accepted.
Why can’t I select a user story for the sprint backlog?
A user story must be in the Approved state to be available for sprint backlog selection. Review the story description, acceptance criteria, estimates, and other relevant information, then mark it Approved when it is ready for sprint planning.
Can I create tasks under user stories?
Yes. During sprint planning, selected user stories can be decomposed into development tasks. Tasks can include a name, description, responsible team member, target completion date, and estimated effort.
Can I estimate task effort?
Yes. Sprint tasks support numerical effort estimates. Teams can use a consistent measurement unit, such as hours or days, according to their preferred estimation practice.
Can I manage multiple sprints in one project?
Yes. Scrum Process Canvas supports sprint-based management. You can create multiple sprints, set their dates, switch between them, and review historical sprint information.
How do I create a new sprint?
Open Create / Switch Sprint, select Create New Sprint, enter the sprint name and start and end dates, and confirm the creation. The newly created sprint becomes the active sprint.
Can I view a previous sprint?
Yes. Open Create / Switch Sprint, select Switch Sprint, choose the required sprint, and confirm. Sprint-related work items will then display information associated with the selected sprint. Remember to switch back to the current working sprint before continuing active work.
Can I record Daily Scrum meetings?
Yes. The Daily Scrum work item allows users to create multiple meeting records for an active sprint. Each record can include meeting information, attendees, Works Done, Works Planned, impediments, and follow-up action items.
Can I record multiple Daily Scrum meetings in one sprint?
Yes. The Daily Scrum interface provides a date switcher for creating and accessing multiple meeting records within the active sprint.
What is the Impediment Log used for?
The Impediment Log is used to record obstacles that affect the productivity or progress of the Scrum Team. It supports descriptions, reporting members, responsible owners, status, reported dates, closure dates, and follow-up actions.
Does Scrum Process Canvas have a burndown chart?
Yes. It includes an automatically generated burndown chart that visualizes remaining sprint effort over time. The initial estimated burndown is based on sprint task effort estimates, and the chart is updated based on recorded progress.
Do I need to draw or manually update the burndown chart?
No manual chart construction is required. The chart is generated from sprint task information and updated based on recorded daily progress. However, team members must maintain accurate task estimates and statuses for the chart to be meaningful.
What is the Scrumboard in Scrum Process Canvas?
The Scrumboard is an automatically formed and updated visual board that displays sprint user stories and their associated tasks according to task status. It provides a quick overview of work in progress, completed work, and closed tasks.
Does Scrum Process Canvas show sprint completion percentages?
Yes. It provides task and user story completion indicators that help teams understand progress at both the task level and the user story level.
Can I manage sprint reviews and user acceptance?
Yes. The Sprint Review Meeting work item supports meeting preparation, demonstration of deliverables, user acceptance recording, discussion notes, and backlog review. Users can mark stories Done or Incomplete according to acceptance outcomes.
What happens if a user story is not accepted during sprint review?
The story can be marked Incomplete. This records that it has not fully satisfied the acceptance requirements and should not be treated as an accepted completed story.
Can I create new stories from an existing story?
Yes. The Split and Extend User Stories function allows teams to create new user stories based on an existing story. It is useful for capturing additional requirements, touch-up work, rework, and bug fixes identified during sprint review.
Does Scrum Process Canvas support sprint retrospectives?
Yes. It supports Start, Stop, and Continue retrospectives. Teams can record improvement ideas, practices to discontinue, successful practices to maintain, voting results, meeting conclusions, and follow-up tasks.
Can I generate a report from Scrum Process Canvas?
Yes. Reports can be generated from completed work items and archived in the Scrum Cabinet. Available reports can also be generated manually through the Outputs panel of a work item.
What is the Scrum Cabinet?
The Scrum Cabinet is a visual document repository within Scrum Process Canvas. It organizes generated reports into cabinet drawers so users can browse and retrieve project documentation.
Can I generate a Lessons Learned report?
Yes. The Project Retrospective activity supports documenting project successes, challenges, difficulties, shortcomings, recommended improvements, and follow-up actions. A Lessons Learned report can be generated from the collected information.
What is the difference between a sprint retrospective and a project retrospective?
A sprint retrospective evaluates how the team worked during a particular sprint and identifies improvements for the next iteration. A project retrospective evaluates the overall project experience and captures lessons that can improve future projects.
Does Scrum Process Canvas integrate with task management?
Yes. It integrates Scrum activities with task management capabilities, allowing teams to create and track tasks associated with sprint work, impediments, and improvement actions.
Can I use Scrum Process Canvas for release planning?
Yes. You can configure product releases, record planned release dates, organize user stories into release partitions through the User Story Map, and maintain a list of project deliverables.
Does Scrum Process Canvas support Agile teams of different sizes?
It provides structured Scrum management capabilities for teams working with product backlogs, sprint planning, daily meetings, progress tracking, and retrospectives. Larger-scale Agile management requirements may call for Visual Paradigm’s separate Large-Scale Scrum Canvas or Nexus Canvas capabilities.
Can I customize the Scrum Process Canvas?
Visual Paradigm provides separate Scrum Process Canvas customization capabilities, including a Process Canvas Editor, Work Item Composer, and process report development. The published edition comparison lists these customization capabilities for Professional and Enterprise editions. They are distinct from simply using the standard Scrum Process Canvas.
Is Scrum Process Canvas suitable for business analysts?
Yes. Business analysts can use its business goal identification, use case modeling, epic management, and user story mapping capabilities to help translate business requirements into structured product backlog items.
Is Scrum Process Canvas a Scrum methodology or a software tool?
Scrum Process Canvas is a software tool in Visual Paradigm Desktop that supports teams in applying and managing Scrum project activities. Scrum itself is the Agile framework; the canvas provides the interfaces, workflow guidance, and documentation capabilities used to organize related project work.
Summary
Scrum Process Canvas in Visual Paradigm Desktop provides an integrated environment for managing the Scrum project lifecycle. It combines visual process navigation, project initiation, use case modeling, product backlog management, User Story Mapping, release planning, sprint backlog management, task estimation, Daily Scrum records, impediment tracking, burndown charts, Scrumboards, sprint reviews, retrospectives, and automatic documentation.
By connecting requirements with development activities and project outcomes, Scrum Process Canvas helps teams reduce administrative overhead, maintain consistent project records, improve progress visibility, and preserve valuable project knowledge. It is particularly useful for Scrum teams that want to manage their Agile workflow through a structured and interconnected workspace rather than relying on disconnected documents and manually maintained tracking tools.