Change Request Management in Visual Paradigm Desktop provides a structured workflow for proposing, implementing, reviewing, and approving changes to shared modeling projects. It allows developers and project members to work on changes independently without immediately modifying the main project, while designated approvers can review the proposed modifications before they are merged back into the shared project.
Integrated with Visual Paradigm’s team collaboration and repository capabilities, Change Request Management introduces a formal approval process for model changes. It helps teams maintain control over project modifications, improve collaboration between developers and reviewers, and reduce the risk of unreviewed changes being introduced into shared models.
The workflow covers the complete change lifecycle: assigning project approvers, creating a change request, making modifications in an independent change request branch, submitting a merge request, reviewing changes online, approving or rejecting the submission, and merging approved changes back into the target branch.
What Is Change Request Management?
Change Request Management is a team collaboration feature in Visual Paradigm Desktop that enables users to propose and implement model changes in independent branches and submit those changes for approval before merging them into the main project.
Instead of allowing every modification to be incorporated directly into the shared project, the feature establishes a controlled review process. Developers work on a change request separately, while designated approvers inspect the proposed modifications and decide whether they should be accepted or rejected.
The feature is particularly useful for teams working on shared UML, BPMN, SysML, database, and other modeling projects where changes may need technical review, stakeholder approval, or additional governance before becoming part of the main project.
Core Purpose
- Controlled change initiation: Create a dedicated change request with a descriptive name and optional rationale.
- Independent development: Work on proposed modifications in a separate change request branch rather than immediately changing the current trunk or branch.
- Formal submission: Commit completed modifications and send a merge request to the designated project approver.
- Online review: Allow approvers to inspect the submitted revisions and changes through the repository’s PostMania portal.
- Contextual feedback: Provide comments on diagrams or individual model elements to communicate review findings.
- Approval and rejection: Let approvers explicitly approve or reject a submitted merge request and optionally provide a decision comment.
- Controlled integration: Merge approved changes back into the target trunk or branch.
Change Request Management vs. Regular Team Collaboration
Visual Paradigm provides team collaboration capabilities such as committing changes, updating projects, resolving conflicts, and maintaining revision history. Change Request Management adds a formal approval stage to this collaboration workflow.
| Aspect | Regular Team Collaboration | Change Request Management |
|---|---|---|
| Working on project changes | Members modify shared project content through repository collaboration. | Developers implement proposed changes in an independent change request branch. |
| Change submission | Changes are committed to the repository. | Completed changes are committed and submitted through a merge request. |
| Review process | Team members can collaborate and review project changes using available collaboration tools. | A designated approver reviews the submitted change request. |
| Approval requirement | Does not inherently require a formal change request approval workflow. | Uses an explicit approval or rejection decision. |
| Feedback | Available through team collaboration and commenting capabilities. | Approvers can comment on diagrams and specific model elements during the review. |
| Integration | Changes are incorporated through normal repository commit and update operations. | Approved changes are explicitly merged back into the target trunk or branch. |
Why Use Change Request Management?
Change Request Management is valuable when modifications to a shared modeling project should be reviewed before they become part of the team’s main project. It provides a structured way to separate development work from approval and integration.
Prevent Unreviewed Changes from Entering the Main Project
In a collaborative modeling environment, a modification to a diagram or model element may affect other parts of the project. Allowing changes to enter the shared project without appropriate review can introduce inconsistencies, architectural problems, or unintended consequences.
Change Request Management allows developers to implement modifications independently and request approval before integrating their work into the target branch.
Establish Clear Responsibilities
The workflow distinguishes between the people implementing changes and the people responsible for approving them.
- Project administrators: Configure project membership and assign the approver permission.
- Developers: Create change requests, implement modifications, and submit merge requests.
- Approvers: Review proposed changes, provide feedback, and approve or reject merge requests.
This separation helps teams establish accountability and makes it clear who is responsible for implementing and authorizing project modifications.
Improve Review Quality
Approvers can inspect the revisions and change details associated with a submitted change request. They can also open individual change entries through PostMania to provide comments on diagrams or specific model elements.
This contextual feedback makes it easier for developers to understand review findings and determine which modifications need attention.
Support Iterative Review and Revision
A rejected merge request does not necessarily mean that the proposed change must be abandoned. Developers can use the approver’s feedback to revise their work and submit another merge request.
This creates an iterative review cycle in which proposed modifications can be refined until they satisfy the required review criteria.
Maintain a More Governed Modeling Process
Change Request Management is especially useful for projects involving multiple developers, architectural reviews, client approval, or organizational governance requirements. It provides a defined process for introducing modifications rather than relying entirely on informal communication and manual coordination.
Edition Availability and Requirements
Change Request Management is available in Visual Paradigm Desktop Professional Edition and Enterprise Edition. It is not included in Standard Edition, Modeler Edition, or Community Edition.
| Visual Paradigm Desktop Edition | Change Request Management |
|---|---|
| Enterprise Edition | Available |
| Professional Edition | Available |
| Standard Edition | Not available |
| Modeler Edition | Not available |
| Community Edition | Not available |
Project and Collaboration Requirements
In addition to having a supported Visual Paradigm Desktop edition, the change request workflow requires a project hosted in a team collaboration repository environment, such as Visual Paradigm Teamwork Server or Visual Paradigm Online.
The project must also have an assigned change approver before users can initiate the change request process.
The main requirements are:
- A Visual Paradigm Desktop Professional or Enterprise license for the change request creation and submission workflow.
- A project hosted in a supported Teamwork Server or Visual Paradigm Online repository.
- Appropriate project membership and permissions.
- At least one project member assigned the Approver permission.
- Repository connectivity for the required project and change submission operations.
Important: Change Request Management is a repository-based collaboration workflow. It is not simply a local diagram review feature or an independent approval tool for standalone project files.
Key Concepts and Terminology
Understanding the following concepts helps clarify how Change Request Management works and how its different stages relate to one another.
Change Request
A change request is a separately managed unit of proposed project modification. It represents a particular change that a developer intends to implement and submit for review.
When creating a change request, users provide a name and may optionally provide a rationale explaining why the change is needed.
Change Request Branch
A change request branch is the independent working area associated with a change request. Developers use it to implement proposed modifications without immediately incorporating them into the current trunk or branch.
This separation allows proposed changes to be reviewed before they are integrated into the target project branch.
Trunk
The trunk is the main development line of a repository project. It represents the main project branch to which approved changes can be merged.
Visual Paradigm’s change request workflow also refers to merging changes back into a branch, so the target is not necessarily limited to the trunk.
Approver
An approver is a project member who has been granted the Approver permission through the project’s advanced member permissions.
The approver is responsible for reviewing submitted merge requests and deciding whether the proposed modifications should be approved or rejected.
Merge Request
A merge request is a formal submission asking the approver to review and authorize the integration of changes made within a change request branch.
Submitting a merge request commits the completed work to the repository and initiates the review process.
PostMania
PostMania is Visual Paradigm’s online collaboration and commenting environment. In the change request workflow, approvers use the repository’s PostMania portal to inspect submitted changes and provide comments on diagrams or individual model elements.
Commit and Send Merge Request
This is the submission operation used by developers after completing their modifications. It commits the changes to the repository and sends a merge request notification to the approver.
Merge Back
Merge Back is the operation used to integrate an approved change request into its target trunk or branch. Approval and merging are separate stages: approval authorizes the change, while Merge Back performs the integration.
How the Change Request Workflow Works
The Change Request Management workflow consists of several connected stages, beginning with approver configuration and ending with the integration of approved modifications.
- Assign a project approver: An administrator grants the Approver permission to a project member.
- Create a change request: A developer creates a change request and provides its name and optional rationale.
- Switch to the change request: The developer chooses whether to switch to the new change request and begin working on it.
- Implement modifications: The developer makes the required changes within the change request branch.
- Submit a merge request: The developer commits the changes and sends a merge request to the approver.
- Review the proposed changes: The approver opens the repository’s PostMania portal and examines the revisions and change details.
- Provide feedback and decide: The approver can comment on specific changes and approve or reject the merge request.
- Revise if necessary: If rejected, the developer modifies the work according to the feedback and resubmits the merge request.
- Merge approved changes: Once approved, the developer uses Team > Merge Back to integrate the modifications into the target trunk or branch.
Workflow Participants and Responsibilities
| Participant | Responsibility |
|---|---|
| Project Administrator | Manages project membership and configures the Approver permission. |
| Developer / Request Initiator | Creates the change request, implements modifications, commits the work, and submits merge requests. |
| Approver | Reviews proposed changes, provides comments, and approves or rejects merge requests. |
| Repository | Stores project changes, manages revisions, and sends relevant merge request notifications. |
Assigning a Change Approver to a Project
Before developers can use Change Request Management, the project must have at least one member assigned the Approver permission. This permission identifies the project member who is authorized to review and decide on submitted merge requests.
The approver is configured through the project administration interface in Teamwork Server or Visual Paradigm Online.
Prerequisites
- You must have sufficient administrative permissions to update the project.
- The target project must exist in the repository.
- The intended approver must already be a member of the project.
How to Assign an Approver
- Open Teamwork Server or Visual Paradigm Online in a web browser and log in as a user with Update Project permission.
- If you are viewing the dashboard, click your name in the upper-right corner and select Administration from the popup menu.
- In the administration panel, select Projects.
- Locate the project that requires an approver, move the pointer over the project, and select Edit.
- Switch to the Members section.
- Locate the member who should become the approver, move the pointer over that member, and select Advanced Permission.
- Enable the Approver permission.
- Press Close to close the advanced permission dialog.
- Press Save in the upper-right corner to save the project configuration.
After the configuration has been saved, the selected member will have the Approver role for that project.
Understanding the Approver Permission
The Approver permission is a project-level member permission. It identifies which project members can participate in the formal change request approval process.
It is important to distinguish this permission from general project membership. Being a project member does not automatically mean that a user is authorized to approve change requests.
Similarly, assigning an approver does not mean that all project members become approvers. The permission must be enabled for the intended member through Advanced Permission.
Can a Project Have More Than One Approver?
The documented workflow explains how to enable the Approver permission for a project member. Teams should configure the appropriate authorized members according to their project governance requirements. The exact behavior and assignment limits for multiple approvers should be verified against the deployed repository version.
Creating a Change Request
After an approver has been assigned to the project, developers can create change requests directly from Visual Paradigm Desktop.
Creating a change request establishes an independent working area for a proposed modification. The developer can then choose whether to switch to that change request and begin implementing the proposed changes.
How to Create a Change Request
- Open the target repository project in Visual Paradigm Desktop.
- From the main menu, select Team > Utilities > Create Change Request.
- Enter a name for the change request.
- Optionally, enter a rationale explaining the reason for the proposed change.
- Press Create to create the change request.
- Visual Paradigm will prompt you to decide whether to switch to the newly created change request.
- Select Yes to switch to the change request and begin working on it, or select No to remain in the current trunk or branch.
Change Request Name
The change request name identifies the proposed modification. A meaningful name makes it easier for developers and approvers to understand the purpose of the change.
For example:
- Refactor Customer Management Model
- Introduce Payment Processing Workflow
- Update Authentication Architecture
- Revise Order Processing Sequence
These are illustrative naming examples rather than predefined system options.
Change Request Rationale
The rationale is an optional description explaining why the change is being proposed.
Providing a rationale is useful when the modification involves architectural decisions, stakeholder requirements, defect corrections, or changes to existing business processes.
For example, a developer might explain that a payment processing workflow needs to be updated to support an additional payment provider. This gives the approver context when reviewing the proposed modifications.
Understanding the Yes and No Options
After creating a change request, Visual Paradigm asks whether the user wants to switch to it.
| Selection | Behavior |
|---|---|
| Yes | Switches to the newly created change request so the developer can begin implementing modifications within it. |
| No | Keeps the developer working in the current trunk or branch instead of immediately switching to the new change request. |
Important: Selecting No does not mean that the change request was rejected or deleted. It means that the developer chooses to remain in the current working context rather than switching immediately.
Working on a Change Request
Once the developer switches to a change request, the proposed modifications can be implemented within its independent working branch.
The main purpose of this separation is to allow development work to proceed without immediately integrating the changes into the current trunk or branch.
Implementing Model Changes
Developers can work on the relevant project models and diagrams as required by the proposed change. For example, a change request might involve:
- Adding or modifying UML classes.
- Updating relationships between model elements.
- Changing a sequence diagram to reflect a revised interaction.
- Modifying a BPMN process to represent a new business workflow.
- Updating database models to accommodate new data requirements.
- Revising architectural diagrams to reflect an approved design direction.
The specific modeling operations depend on the nature of the requested modification and the diagram types used in the project.
Independent Development
Because the change request is maintained separately from the current trunk or branch, developers can work on the proposed modifications before requesting integration.
This separation is particularly useful when:
- A proposed modification requires substantial development work.
- Changes need to be reviewed by a technical lead or architect.
- A client or stakeholder must approve design modifications.
- Multiple proposed changes need to be evaluated independently.
- Teams want to avoid introducing unapproved modifications into their main project.
When Should Developers Submit a Merge Request?
A developer should submit a merge request when the modifications associated with the change request are ready for review.
Before submitting, it is good practice to ensure that the intended changes have been completed and that the project is in an appropriate state for the approver to evaluate.
The formal submission is performed using the Commit and Send Merge Request operation.
Submitting a Merge Request
After completing the modifications in a change request, the developer can submit the work for approval using Commit and Send Merge Request.
This operation commits the changes to the repository and sends an email notification to the designated approver, informing them that the work is ready for review.
How to Submit a Merge Request
- Make sure you are working in the intended change request.
- Complete the required model modifications.
- When the work is ready for review, select Commit and Send Merge Request.
- Visual Paradigm commits the modifications to the repository.
- The repository sends an email notification to the designated approver to inform them that the merge request has been submitted.
What Happens When a Merge Request Is Submitted?
Submitting a merge request initiates the formal review stage of the change request workflow.
The following actions take place:
- The completed modifications are committed to the repository.
- The submitted work becomes available for the approver to inspect.
- The approver receives an email notification about the merge request.
- The approver can access the Change Request section of the repository’s PostMania portal through the link provided in the notification email.
Why Is the Operation Called Commit and Send Merge Request?
The operation combines two related actions:
- Commit: Saves the developer’s completed modifications to the repository as revisions.
- Send Merge Request: Initiates the formal approval process by notifying the approver that the changes are ready for review.
These actions are related but have different purposes. Committing preserves the work in the repository, while sending the merge request requests authorization to integrate that work into the target branch.
Important: Sending a merge request does not automatically merge the changes into the trunk or target branch. The approver must review and approve the submission, after which the developer can perform the Merge Back operation.
Reviewing a Merge Request
After a developer submits a merge request, the designated approver can review the proposed modifications through the repository’s PostMania portal.
The review process allows the approver to inspect the submitted revisions, examine individual change details, provide comments, and decide whether the proposed changes should be approved or rejected.
Accessing the Submitted Merge Request
- The approver receives an email notification from the repository indicating that a merge request has been submitted.
- Open the notification email.
- Click the link provided in the email.
- The link opens the Change Request section of the repository’s PostMania portal.
Inspecting Revisions and Change Details
The Change Request page displays the revisions and change details associated with the submitted change request.
This allows the approver to examine the modifications made by the developer before deciding whether they should be integrated into the target branch.
During review, the approver can:
- Inspect the list of revisions associated with the change request.
- Review the change details presented on the page.
- Identify the diagrams or model elements associated with individual changes.
- Open individual change entries for more contextual review and commenting.
Reviewing Individual Changes Through PostMania
Visual Paradigm provides a way for approvers to open individual change entries using the PostMania icon displayed next to a change entry.
- Locate the modification that requires further examination.
- Click the PostMania icon next to the relevant change entry.
- Open the associated diagram or model element for review and commenting.
- Enter comments to communicate questions, observations, or requested modifications to the developer.
Comments can be made on diagrams or specific model elements, allowing reviewers to provide feedback in the context of the actual design rather than relying entirely on general email discussions.
Notifications to Developers
When an approver leaves comments through PostMania, developers receive notifications through their Visual Paradigm Desktop application.
This helps developers become aware of review feedback and respond to comments without having to continuously monitor the online review page.
Why Contextual Comments Matter
Contextual comments make the review process more effective because they connect feedback directly to the relevant design content.
For example, an approver reviewing a sequence diagram might identify an incorrect message flow and leave a comment on the relevant diagram or model element. The developer can then understand exactly which part of the design requires attention.
Approving or Rejecting a Merge Request
After reviewing the proposed modifications, the approver must decide whether to approve or reject the submitted merge request.
The decision is made through the Reply operation at the top of the Change Request page in PostMania.
How to Approve or Reject a Merge Request
- Open the submitted merge request through the notification email.
- Review the revisions and change details.
- Inspect individual changes and provide comments where necessary.
- When the review is complete, press Reply at the top of the page.
- Select the appropriate decision to approve or reject the merge request.
- Optionally, enter a comment explaining the decision or providing feedback to the developer.
- Submit the reply.
Approving a Merge Request
When a merge request is approved, the developer receives an email notification informing them of the approval.
Approval indicates that the proposed modifications have passed the review decision and can proceed to the integration stage.
The developer can then reopen the project in Visual Paradigm Desktop and use Team > Merge Back to merge the approved changes into the target trunk or branch.
Rejecting a Merge Request
When a merge request is rejected, the developer receives an email notification informing them of the rejection.
The approver can also include a comment explaining the decision or identifying the modifications that need to be revised.
The developer should then:
- Review the rejection notification and the approver’s comments.
- Return to the relevant change request.
- Modify the models according to the review feedback.
- Complete the necessary corrections.
- Submit another merge request using Commit and Send Merge Request.
The revised work can then go through the review and approval process again.
Approval vs. Rejection
| Decision | Meaning | Next Action |
|---|---|---|
| Approve | The proposed modifications are accepted for integration. | The developer proceeds to Team > Merge Back. |
| Reject | The proposed modifications are not accepted in their current form. | The developer reviews the feedback, revises the work, and resubmits the merge request. |
Can an Approver Include a Comment with the Decision?
Yes. The approver can enter a comment when replying to the merge request. This allows the approver to explain the approval or rejection decision and communicate additional feedback to the developer.
Are Developers Notified of the Decision?
Yes. The repository sends an email notification to the developer informing them whether the merge request has been approved or rejected.
Merging Approved Changes Back into the Project
After a merge request has been approved, the developer can integrate the proposed modifications into the target trunk or branch using the Merge Back operation.
This is the final integration stage of the change request workflow. Approval authorizes the changes, while Merge Back incorporates them into the target project branch.
How to Merge Approved Changes Back
- Wait for the approval notification email from the repository.
- Open or reopen the relevant project in Visual Paradigm Desktop.
- From the main menu, select Team > Merge Back.
- Perform the merge back operation to integrate the approved changes into the target trunk or branch.
Understanding the Merge Back Operation
Merge Back completes the change request lifecycle by transferring approved modifications from the independent change request into the target development line.
This ensures that the main project receives changes only after they have passed the designated approval process.
Why Approval and Merge Back Are Separate Operations
Visual Paradigm separates the approval decision from the actual integration operation.
- Approval is the reviewer’s authorization for the proposed modifications to be incorporated.
- Merge Back is the developer’s operation to integrate the approved modifications into the target trunk or branch.
This distinction is important because an approved merge request should not be confused with a change that has already been merged into the main project.
Notifications Throughout the Change Request Lifecycle
Notifications help developers and approvers stay informed about important events during the change request process.
Visual Paradigm uses repository-generated email notifications and in-application notifications to communicate relevant updates.
Notification Events
| Event | Recipient | Notification Method |
|---|---|---|
| A developer submits a merge request. | Designated approver | Email notification from the repository. |
| An approver comments on a change through PostMania. | Developer | Notification in Visual Paradigm Desktop. |
| A merge request is approved. | Developer | Email notification from the repository. |
| A merge request is rejected. | Developer | Email notification from the repository. |
Why Notifications Are Important
Notifications reduce the need for manual communication between developers and approvers. They help ensure that:
- Approvers are informed when changes are ready for review.
- Developers are aware when reviewers provide comments.
- Developers know when a merge request has been approved.
- Developers know when a merge request has been rejected and requires further work.
Notifications support the workflow but do not replace the actual review, approval, or merge operations.
Practical Example: Managing a Change to a Shared System Model
Consider a software development team maintaining a shared system architecture project in Visual Paradigm Desktop. The team wants to introduce a new payment processing component into the existing architecture.
Because the architecture is shared by multiple developers, the proposed change must be reviewed by the project architect before it becomes part of the main project.
Project Setup
The project administrator opens the project administration interface and grants the project architect the Approver permission through Advanced Permission.
Change Initiation
A developer creates a new change request named Introduce Payment Processing Component and enters a rationale explaining that the system must support an additional payment provider.
The developer selects Yes when prompted to switch to the new change request.
Development
The developer updates the relevant architecture diagrams, adds the proposed payment processing component, and modifies the relationships between the existing components.
All these modifications are implemented within the independent change request branch.
Submission
After completing the modifications, the developer selects Commit and Send Merge Request.
The changes are committed to the repository, and the project architect receives an email notification that the submission is ready for review.
Review and Feedback
The architect opens the merge request through the email link and examines the revisions and change details in the PostMania portal.
During the review, the architect identifies an issue with the proposed communication between the payment processing component and the existing order management component.
The architect uses the PostMania commenting capability to leave feedback on the relevant diagram or model element.
The developer receives a notification through Visual Paradigm Desktop.
Revision and Resubmission
The developer reviews the architect’s feedback, corrects the interaction model, and submits another merge request using Commit and Send Merge Request.
The architect reviews the revised submission and approves it.
Integration
After receiving the approval notification, the developer reopens the project and selects Team > Merge Back.
The approved payment processing modifications are merged into the target branch, completing the change request process.
This example illustrates how Change Request Management enables teams to develop proposed modifications independently, obtain review feedback, and integrate approved changes through a controlled workflow.
Best Practices for Change Request Management
To make the change request process more effective, teams should establish clear conventions for creating, implementing, reviewing, and approving proposed modifications.
Use Descriptive Change Request Names
Choose names that clearly describe the purpose of each change request. Avoid vague names such as “Update Model” or “New Changes” because they provide little information to reviewers.
Provide a Meaningful Rationale
Although the rationale is optional, providing a short explanation helps approvers understand why a change is necessary and what problem it is intended to solve.
Assign Appropriate Approvers
Grant Approver permission to people who have the appropriate technical knowledge or decision-making authority to review project changes.
For architecture-related modifications, for example, the designated approver should ideally understand the project’s architectural standards and design constraints.
Keep Change Requests Focused
Whenever practical, group related modifications into a coherent change request. Focused submissions make it easier for approvers to understand the scope of the proposed change and provide meaningful feedback.
Review Before Submitting
Developers should inspect their modifications before using Commit and Send Merge Request. This helps reduce unnecessary review cycles caused by incomplete or unintended changes.
Use Contextual Comments
Approvers should use PostMania comments to identify the specific diagrams or model elements that require attention. Clear, contextual feedback makes it easier for developers to understand and resolve review findings.
Explain Rejection Decisions
When rejecting a merge request, provide constructive feedback explaining what needs to be corrected. This helps developers revise the work efficiently and submit a more complete revision.
Do Not Confuse Approval with Integration
Remember that approval and merging are separate stages. After approval, the developer must still perform the Merge Back operation to integrate the changes into the target trunk or branch.
Troubleshooting and Common Questions
Why Can’t I Find the Create Change Request Menu?
The Create Change Request operation requires a supported Visual Paradigm Desktop edition and an appropriately configured repository project.
Check the following:
- Confirm that you are using Professional Edition or Enterprise Edition.
- Confirm that the project is opened from a supported Teamwork Server or Visual Paradigm Online repository.
- Confirm that the project has at least one member assigned the Approver permission.
- Check whether your account has the required project permissions.
Why Is the Change Request Process Unavailable for My Project?
The change request process becomes available to a project once an approver has been assigned.
Ask a project administrator to check the Members section of the project administration interface and enable the Approver permission for an appropriate member.
Can I Create a Change Request Without Switching to It Immediately?
Yes. After creating a change request, Visual Paradigm prompts you to switch to it. Selecting No allows you to remain in the current trunk or branch rather than immediately switching to the newly created change request.
Is the Change Request Rationale Mandatory?
No. The rationale is optional when creating a change request. However, providing a meaningful explanation is recommended because it gives the approver useful context about the proposed modification.
Does Creating a Change Request Automatically Modify the Main Project?
No. A change request provides an independent working area for proposed modifications. The developer works on the change request before submitting it for approval and integrating it into the target branch.
Does Sending a Merge Request Automatically Merge the Changes?
No. Commit and Send Merge Request commits the changes to the repository and initiates the approval process. The changes are not automatically merged into the target trunk or branch.
The approver must first review and approve the merge request. The developer then performs Team > Merge Back to integrate the approved modifications.
Where Does the Approver Review a Merge Request?
The approver reviews the submitted merge request through the Change Request section of the repository’s PostMania portal. The approver can access the relevant page by clicking the link in the merge request notification email.
Can an Approver Comment on Individual Model Elements?
Yes. The approver can click the PostMania icon next to a change entry to open the associated content for commenting. Comments can be made on diagrams or specific model elements.
How Does a Developer Know That the Approver Has Left Comments?
Developers receive notifications through their Visual Paradigm Desktop application when approvers leave comments through PostMania.
What Happens When a Merge Request Is Rejected?
The developer receives an email notification about the rejection. The developer should review the approver’s comments, modify the change request accordingly, and submit another merge request.
Can a Rejected Merge Request Be Submitted Again?
Yes. Rejection does not prevent the developer from revising the proposed modifications and submitting the work again. The developer can correct the issues identified by the approver and use Commit and Send Merge Request to initiate another review.
What Happens After a Merge Request Is Approved?
The developer receives an email notification confirming approval. The developer can then reopen the project in Visual Paradigm Desktop and select Team > Merge Back to merge the approved modifications into the target trunk or branch.
Does Approval Automatically Perform Merge Back?
No. Approval and Merge Back are separate operations. Approval authorizes the proposed changes, while Merge Back performs the actual integration into the target branch.
Can Changes Be Merged Back into a Branch Other Than the Trunk?
Yes. Visual Paradigm’s documented workflow describes merging approved changes back into the trunk or branch. Therefore, the integration target is not necessarily limited to the main trunk.
Is Change Request Management Available in Standard Edition?
No. According to the current Visual Paradigm Desktop edition comparison, Change Request Management is available in Professional Edition and Enterprise Edition, but not Standard Edition.
Is Change Request Management the Same as Diagram Review and Commenting?
No. Diagram review and commenting allows stakeholders to view shared diagrams and provide feedback. Change Request Management provides a more formal workflow for implementing modifications independently, submitting them for approval, and merging approved changes into a repository branch.
Does Change Request Management Require Visual Paradigm Online?
The change request workflow uses a supported repository environment, which can be Visual Paradigm Teamwork Server or Visual Paradigm Online. The review stage uses the repository’s online PostMania portal. Visual Paradigm Online is therefore one supported environment, but the documented workflow also supports Teamwork Server.
Frequently Asked Questions About Change Request Management
What is Change Request Management in Visual Paradigm?
Change Request Management is a repository-based collaboration feature that allows developers to create independent change requests, implement model modifications, submit merge requests for approval, and merge approved changes into the target trunk or branch.
Which Visual Paradigm editions support Change Request Management?
Visual Paradigm Desktop Professional Edition and Enterprise Edition support Change Request Management. Standard, Modeler, and Community editions do not include this feature.
What is the difference between a change request and a merge request?
A change request is the independent working unit in which proposed modifications are implemented. A merge request is the formal submission asking an approver to review and authorize the integration of those modifications into the target branch.
Who can approve a change request?
A project member who has been granted the Approver permission through the project’s Advanced Permission settings can participate in the change request approval process.
Where do I assign the Approver permission?
Log in to Teamwork Server or Visual Paradigm Online, open Administration, select Projects, edit the target project, switch to Members, open the intended member’s Advanced Permission settings, enable Approver, and save the project.
How do I create a change request in Visual Paradigm Desktop?
Open the repository project and select Team > Utilities > Create Change Request. Enter a name, optionally provide a rationale, and press Create. Visual Paradigm then asks whether you want to switch to the newly created change request.
What does Commit and Send Merge Request do?
It commits the modifications made in the change request to the repository and sends an email notification to the designated approver so that the proposed changes can be reviewed.
Where can I find a submitted merge request?
The approver can open the merge request through the link in the repository-generated notification email. The link opens the Change Request section of the repository’s PostMania portal.
Can an approver review changes online?
Yes. Approvers can review submitted revisions and change details through the PostMania portal without performing the development work in Visual Paradigm Desktop.
Can an approver provide feedback before making a decision?
Yes. Approvers can open individual change entries using the PostMania icon and leave comments on diagrams or specific model elements.
What happens if a merge request is rejected?
The developer receives an email notification and can use the approver’s feedback to revise the change request. The developer can then submit another merge request for review.
How do I merge an approved change request?
After receiving the approval notification, reopen the project in Visual Paradigm Desktop and select Team > Merge Back. This integrates the approved modifications into the target trunk or branch.
Does the change request workflow support iterative reviews?
Yes. If a merge request is rejected, the developer can revise the proposed modifications and submit another merge request. This allows the work to go through repeated review and feedback cycles.
Is Change Request Management intended for standalone local projects?
No. The documented workflow depends on a repository-based team collaboration environment, such as Teamwork Server or Visual Paradigm Online. It is intended for managing changes to shared repository projects.
What is the role of PostMania in Change Request Management?
PostMania provides the online review and commenting environment. Approvers use it to inspect submitted change details, comment on diagrams or model elements, and approve or reject merge requests.
Is a merge request the same as a completed merge?
No. A merge request is a request for approval to integrate proposed changes. A completed merge occurs when the approved changes are merged back into the target trunk or branch using Team > Merge Back.