Tasifier is an integrated task management tool in Visual Paradigm that helps software development teams plan, organize, assign, monitor, and collaborate on project activities. It brings task management closer to software design and development by allowing team members to access and manage tasks directly within Visual Paradigm Desktop or through a web browser.
Designed with software development teams in mind, Tasifier provides a centralized workspace for managing development activities, organizing work into Task Pools, assigning responsibilities, tracking deadlines, discussing progress, sharing files, and monitoring team workloads. It supports the entire task management process, from initial planning and assignment to execution, verification, and completion.
Unlike a conventional personal to-do list, Tasifier connects tasks with projects, team members, related development artifacts, and ongoing discussions. It also supports specialized workflows such as task breakdown, multi-stage activities, task verification, and integration with Visual Paradigm diagrams and development models.
What Is Tasifier?
Tasifier is a collaborative task management solution for software development teams. It provides a shared environment in which team members can create tasks, organize related work, assign responsibilities, set due dates, communicate through comments, attach supporting files, and monitor task progress.
Tasifier is part of Visual Paradigm’s team collaboration environment. It can be accessed directly from Visual Paradigm Desktop through the Team menu or used through its web interface. This integration allows developers, analysts, designers, testers, and project managers to coordinate development activities without having to manage their task information in a completely separate environment.
The main concepts in Tasifier are:
- Project: The primary workspace containing related development activities, members, and Task Pools.
- Task: An individual unit of work that needs to be performed, assigned, tracked, or verified.
- Task Pool: A logical collection of related tasks, commonly organized around a feature, development phase, use case, priority, or iteration.
- Assignee: The team member responsible for performing a task or an individual task stage.
- Verifier: The team member responsible for checking the result of a completed task.
- Tag: A classification label used to categorize and locate tasks.
- Subtask: A smaller unit of work created to break down a larger task.
- Stage: A sequential portion of a task that can be assigned to a different team member.
- Follower: A member who receives notifications when a task is updated.
- Comment: A message posted to a task to discuss requirements, progress, questions, or feedback.
- Attachment: A file included with a task or comment to provide supporting information or deliverables.
These concepts work together to provide a structured approach to managing development work and coordinating collaboration among project members.
Why Use Tasifier for Software Development Task Management?
Software development involves many interdependent activities, including requirements analysis, interface design, database development, programming, testing, documentation, and deployment. Tasifier helps teams organize these activities into manageable tasks and coordinate the people responsible for completing them.
Centralize development activities
Keep tasks, assignments, comments, attachments, and progress information together in a shared project environment. Team members can access the relevant task information instead of relying on disconnected task lists, email conversations, or separate tracking documents.
Improve task ownership and accountability
Assign tasks to specific team members and optionally designate another member to verify completed work. Clear responsibility makes it easier to understand who is working on an activity and who is responsible for reviewing its result.
Organize complex projects into manageable groups
Use Task Pools to group related activities into meaningful collections. For example, a development project can have separate Task Pools for requirements analysis, user interface design, database implementation, testing, and deployment.
Prioritize work effectively
Use the New, To Do, and Pending lists in My Tasks to organize assigned work according to when it should be addressed. Due dates and overdue task views provide additional visibility into upcoming responsibilities.
Improve team communication
Discuss task requirements, report progress, raise issues, request changes, and provide feedback through task comments. Members can follow tasks to receive notifications about subsequent updates.
Break complex work into smaller activities
Use subtasks to decompose large assignments into smaller units of work. For activities that require sequential participation by different specialists, use task stages to coordinate the handover from one team member to another.
Connect task management with visual modeling
When using Tasifier inside Visual Paradigm Desktop, teams can work with development tasks alongside their models and diagrams. Supported workflows include managing tasks associated with use cases and attaching diagrams or Teamwork Files to task comments.
Monitor team workload
Review tasks assigned to individual members and generate workload reports to understand which activities are newly assigned, being processed, completed, closed, or outstanding.
Edition and Availability
Tasifier is a team collaboration capability, not a standalone local task management module that operates independently of a collaboration environment.
Visual Paradigm Desktop editions
Visual Paradigm’s edition comparison lists Team Collaboration capabilities across Enterprise, Professional, Standard, Modeler, and Community editions. However, the availability of Tasifier in a particular installation also depends on the connected collaboration environment, project configuration, and applicable service or server access.
For Tasifier to open inside Visual Paradigm Desktop, the following conditions must be satisfied:
- Visual Paradigm Desktop must have an active connection to VPository or a supported corporate edition of Visual Paradigm Teamwork Server.
- The currently opened project must have Tasifier enabled.
- The current user must have access to the relevant project and collaboration environment.
Access through Visual Paradigm Desktop
When the requirements are satisfied, select Team > Tasifier from the main menu. Tasifier opens as a new tab inside Visual Paradigm Desktop.
Access through a web browser
Tasifier can also be accessed through its web interface. Project members can manage their assigned tasks and collaborate without having to open the Visual Paradigm Desktop application.
Important availability distinction
The edition comparison for Team Collaboration should not be interpreted as a guarantee that every Tasifier-related service, server deployment, or administrative capability is included in every subscription. VPository and Visual Paradigm Teamwork Server have their own service and deployment requirements. Organizations should verify their collaboration subscription, server configuration, and project permissions when planning to use Tasifier.
Accessing Tasifier in Visual Paradigm Desktop
Tasifier can be opened directly from the Visual Paradigm Desktop interface when the active project is connected to a supported collaboration environment and has Tasifier enabled.
Prerequisites
- An accessible Visual Paradigm collaboration environment, such as VPository or Visual Paradigm Teamwork Server.
- A project stored in or accessible through that collaboration environment.
- Tasifier enabled for the project.
- A valid project member account with the necessary access permissions.
Steps to open Tasifier
- Start Visual Paradigm Desktop.
- Connect to the appropriate collaboration environment.
- Open the project in which you want to manage development tasks.
- From the main menu, select Team > Tasifier.
- Wait for Tasifier to load in a new tab.
- Use the Left Pane to navigate between My Tasks, Inbox, overdue tasks, tags, Task Pools, and project members.
When the Tasifier menu is disabled or cannot open
If the Tasifier command is unavailable or Tasifier fails to open, check the following:
- Confirm that Visual Paradigm Desktop is connected to VPository or a supported corporate edition of Visual Paradigm Teamwork Server.
- Verify that the currently opened project has Tasifier enabled.
- Confirm that your account has access to the project.
- Check whether the collaboration server is available and the connection is functioning correctly.
Opening Tasifier does not automatically create a project, Task Pool, or task. These items must be configured or created as part of the team’s task management workflow.
Tasifier Interface Overview
Tasifier uses a three-pane interface to help users navigate tasks, review task lists, and work with individual task details.
Left Pane
The Left Pane provides navigation to the different task views and collaboration features.
- Profile: Displays the current member’s profile photo and name. Members can access profile editing options from this area.
- My Tasks: Displays tasks assigned to the current member, organized into New, To Do, and Pending lists.
- Inbox: Displays messages and notifications generated by Tasifier.
- Overdue: Provides access to tasks organized by their due status, including overdue tasks and tasks due soon.
- Tags: Provides access to defined tags and the tasks associated with each tag.
- Active Project: Shows the currently selected project. Members can switch projects from this area.
- Task Pools: Lists the Task Pools belonging to the active project.
- Members: Displays project members. Selecting a member allows users to review tasks assigned to that person.
Main Pane
The Main Pane displays the task list corresponding to the current selection in the Left Pane. For example, selecting My Tasks displays the current member’s assigned tasks, while selecting a Task Pool displays the tasks belonging to that collection.
Depending on the selected view and the user’s permissions, the Main Pane provides controls for creating tasks, sorting task lists, filtering results, and performing other task management operations.
Task Pane
The Task Pane appears when a task is selected in the Main Pane. It displays the detailed information associated with that task.
Depending on the task and its configuration, the Task Pane provides access to:
- Task subject and description.
- Assignee and verifier.
- Due date.
- Tags.
- Task attachments.
- Subtasks.
- Task stages.
- Comments and discussion history.
- Followers.
The Task Pane is the primary workspace for reviewing task details, updating task properties, adding comments, following tasks, and working with related files.
Project Management in Tasifier
A project is the primary organizational unit in Tasifier. It represents the system, product, feature, or other development objective that the team intends to accomplish.
Each project can contain project members, Task Pools, and individual tasks. Task Pools provide an additional organizational level for grouping related activities.
Project members
Project members are the people who can participate in the project’s task management activities. They can be assigned work, review tasks, contribute comments, and collaborate through Tasifier according to their permissions.
Switching between projects
The currently active project is displayed in the Left Pane. Select the project name to switch to another accessible project. The available Task Pools and project members are updated to reflect the selected project.
Enabling Tasifier for a project
Tasifier must be enabled for a project before members can use it. Project configuration and administration are handled through the collaboration environment. A project administrator should verify that Tasifier is enabled when the feature is not available for an existing project.
Task Pools: Organizing Related Development Work
A Task Pool is a logical collection of related tasks within a project. It provides a structured way to group development activities according to a feature, functional area, development phase, priority, or iteration.
For example, a software development project might use the following Task Pools:
- Requirements Analysis: Collect requirements, interview stakeholders, and document business rules.
- User Interface Design: Prepare screen layouts, review navigation, and define interaction behavior.
- Database Development: Design database structures, create tables, and implement database access.
- Implementation: Develop application functionality and integrate components.
- Testing: Prepare test cases, execute tests, and resolve defects.
- Deployment: Prepare deployment packages, configure environments, and release the application.
Creating a Task Pool
- Open Tasifier and select the appropriate project.
- Locate the Task Pools section in the Left Pane.
- Click the + button beside Task Pools.
- Enter a meaningful name for the new Task Pool.
- Confirm the creation.
- Select the newly created Task Pool to begin organizing its tasks.
Planning tasks before starting a Task Pool
Tasifier supports a planning phase in which team members can prepare and organize tasks before the actual work begins.
When a Task Pool is in the Planning state, members can prepare tasks and assignments. However, assigned tasks are not yet displayed in the assignees’ My Tasks lists. This allows the team to organize the workload before officially starting the work.
Kicking off a Task Pool
When task planning is complete, the Task Pool can be kicked off. This starts the work and makes assigned tasks visible in the relevant members’ My Tasks lists.
- Select the Task Pool in the Left Pane.
- Ensure that the Task Pool is in the Planning state.
- Review its tasks and assignments.
- Click Kick off near the Task Pool name.
- Allow assigned members to begin working on their tasks.
Task Pool statuses
Task Pools have three default statuses: Planning, Working, and Closed. These statuses determine the operational state of the Task Pool and influence what members can do with its tasks.
| Status | Meaning | Behavior |
|---|---|---|
| Planning | The Task Pool has not started. | Members can prepare and organize tasks. Assigned tasks are not yet shown in assignees’ My Tasks lists. |
| Working | The Task Pool is active. | Members can work on its tasks according to their permissions. |
| Closed | The Task Pool has finished its mission. | The Task Pool and its tasks become read-only. Members cannot add or remove tasks, edit tasks, or add comments. |
Configuring Task Pool statuses
Tasifier also supports customized Task Pool statuses. Members with the appropriate permission can configure the status workflow.
To configure statuses:
- Move the pointer over the Task Pools caption in the Left Pane.
- Click the gear button that appears, provided that you have permission to configure statuses.
- In the Task Pool Status Setting window, create or edit statuses.
- Define the entry condition for each status.
- Configure the attributes that determine the behavior of the Task Pool in that status.
- Arrange statuses in the intended order by dragging them.
- Click Save.
Status attributes can control whether tasks are considered kicked off, whether tasks are read-only, and whether the task list is read-only. The order of statuses determines the next status available when a Task Pool proceeds through its workflow.
The configuration of Task Pool statuses is shared across projects. Consequently, changes to the status configuration can affect the status workflow available in multiple projects.
Closing a Task Pool
When the work managed by a Task Pool is finished, the Task Pool can be moved to its Closed status. A closed Task Pool is read-only. It is intended for completed work that should remain available for reference rather than further editing.
Creating tasks inside a Task Pool
Tasks can be created directly inside a Task Pool while it is in a state that permits task creation, such as Planning or Working. A closed Task Pool does not allow new tasks to be created.
Although Tasifier also allows tasks to be created directly under a project without belonging to a Task Pool, organizing related work into Task Pools is generally recommended for better project structure.
Task Management: Creating, Editing, and Assigning Tasks
A task is an individual unit of work managed by Tasifier. It describes something that needs to be done and can include a subject, description, assignee, due date, verifier, tags, attachments, comments, and subtasks.
Creating a task in My Tasks
My Tasks is suitable for creating personal reminders or work items that do not initially belong to a Task Pool.
- Select My Tasks in the Left Pane.
- Choose the appropriate list: New, To Do, or Pending.
- Click the last empty row in the selected list.
- Enter the task subject.
- Press Enter to confirm the task.
- Select the task to open its Task Pane.
- Optionally enter a more detailed task description.
- Set a due date if required.
- Optionally designate a verifier.
Tasks created in My Tasks are not automatically associated with a Task Pool. They can, however, be moved into a Task Pool later.
Creating a task in a Task Pool
When an activity belongs to a particular project workstream or development objective, create it inside the appropriate Task Pool.
- Open the relevant project.
- Select a Task Pool in the Left Pane.
- Ensure the Task Pool is in Planning or Working status.
- Click the last empty row in the task list.
- Enter the task subject.
- Press Enter to create the task.
- Select the task to open the Task Pane.
- Enter a detailed description when necessary.
- Assign the responsible team member.
- Optionally set a due date.
- Optionally designate a verifier.
Editing a task description
The task description provides additional information beyond the short subject.
- Open the task in the Task Pane.
- Click the area below the task subject.
- Enter or modify the description.
- Use Enter to create new lines.
- Press Ctrl+Enter or click outside the description field to confirm the changes.
Assigning a task
The assignee is the member responsible for carrying out the task. Assigning a task makes responsibility clear and allows the member to find the work in their My Tasks view when the relevant Task Pool has been started.
To assign a task:
- Open the task in the Task Pane.
- Click the assignee profile icon near the top of the pane.
- Select the appropriate project member.
Reassigning tasks
Tasifier supports direct task reassignment through the Task Pane or drag-and-drop operations.
Method 1: Through the Task Pane
- Open the task details.
- Click the current assignee’s profile photo.
- Select the new assignee.
Method 2: Drag and drop
- Select one or more tasks in the Main Pane.
- Use Shift or Ctrl to select multiple tasks when necessary.
- Drag the selected tasks to the profile photo of the desired member at the bottom of the Left Pane.
Moving tasks between Task Pools
Tasks can be moved between Task Pools when their organizational grouping changes.
Method 1: Through the Task Pane
- Open the task details.
- Click the arrow beside the Task Pool name.
- Select the destination Task Pool.
- To move the task to a Task Pool in another project, select Change project and choose the appropriate destination.
Method 2: Drag and drop
- Select one or more tasks in the Main Pane.
- Use Shift or Ctrl to select multiple tasks.
- Drag the selected tasks to the destination Task Pool in the Left Pane.
Duplicating and deleting tasks
Tasifier supports task duplication and deletion. Duplication is useful when several activities share similar task information, while deletion is appropriate when a task was created by mistake or is no longer required.
These operations should be performed on the intended task after opening or selecting it. Users should check the task’s project, Task Pool, and assignment before deleting it, particularly when it is part of an active team workflow.
My Tasks: Managing Individual Workloads
My Tasks displays the tasks currently assigned to the logged-in member. It provides a personal workspace for reviewing responsibilities and deciding what work to perform next.
My Tasks contains three main lists: New, To Do, and Pending.
New
The New list contains recently received tasks that have not yet been moved into the active To Do or later Pending workload.
To Do
The To Do list contains tasks that should be tackled within a short period. It helps members identify work that needs immediate attention.
Pending
The Pending list contains tasks that will be addressed later rather than immediately.
Prioritizing tasks in My Tasks
Members can prioritize their work by moving tasks between the three lists and changing the order of tasks within a list.
Common prioritization operations include:
- Moving a task from New to To Do when it should be addressed soon.
- Moving a task from New to Pending when it should be handled later.
- Moving a task between To Do and Pending as priorities change.
- Reordering tasks within a list using drag and drop.
- Selecting multiple tasks and moving them together.
To move a task, drag it to the desired list or use the task’s down-arrow menu and choose the appropriate destination. Multiple tasks can be selected using Shift before dragging them together.
My Tasks is automatically updated as task assignments and relevant task information change, making it useful as a continuously available personal work queue.
Due Dates and Overdue Task Management
A due date specifies the date by which a task is expected to be completed. Tasifier uses due dates to help members organize their schedules and identify work that requires attention.
Setting or changing a due date
- Open the task in the Task Pane.
- Locate the Due Date field near the top-right area of the pane.
- If no date is set, click Due Date. If a date already exists, click the displayed date.
- Open the date selection interface.
- Select the required date.
- Confirm the selection.
Overdue tasks
A task becomes overdue when its due date has passed and it has not been completed. Tasifier provides an Overdue view to help members identify overdue and upcoming work.
Reviewing upcoming deadlines
The Overdue section supports reviewing tasks according to their due status, including:
- Tasks that are already overdue.
- Tasks due tomorrow.
- Tasks due within the current week.
- Tasks due within the next week.
Members can use these views to review their workload and decide which activities should be addressed first.
Recurring tasks
Tasifier also supports repeating tasks through the Repeat option in the due-date settings. For example, selecting a Daily repeat option causes another task to be created one day after the current task is completed, with the task details copied from the original task.
Recurring tasks are useful for routine activities that need to be performed repeatedly, such as regular reviews, maintenance checks, or recurring administrative work.
Task Verification and Quality Control
Tasifier allows a task to have a verifier in addition to its assignee. The assignee performs the work, while the verifier checks whether the completed result is acceptable.
This separation is useful when work requires review or approval by someone other than the person performing it.
Assigning a verifier
- Open the task in the Task Pane.
- Locate the verifier selection area near the Due Date field.
- Select the team member responsible for verifying the task.
- Save or confirm the task changes as appropriate.
What happens when a task is completed?
The behavior depends on whether a verifier has been assigned.
- With a verifier: When the assignee completes the task, it appears in the verifier’s My Tasks page, pending verification.
- Without a verifier: The task is closed automatically after completion.
This workflow helps teams introduce a review stage without requiring every task to go through a separate manual approval process.
Subtasks: Breaking Down Complex Work
A subtask is a smaller unit of work created under a parent task. It allows a large assignment to be divided into more manageable activities.
For example, a task called Develop Customer Registration could be broken down into:
- Design the registration interface.
- Implement input validation.
- Develop the registration API.
- Integrate database operations.
- Test the registration workflow.
Creating subtasks
- Open the parent task in the Task Pane.
- Click the Subtasks button above the task subject.
- In the subtask list, click the empty row.
- Enter the subtask subject.
- Press Enter to confirm.
- Repeat to add more subtasks.
- Open an individual subtask through its Details option to edit its information.
Managing subtask details
Individual subtasks can have their own descriptions and task properties, including assignees, due dates, and tags. Members can navigate back to the parent task using the link above the subtask subject in the Task Pane.
When should subtasks be used?
- When one larger assignment can be divided into smaller activities.
- When the team needs to track the details of a larger deliverable.
- When several pieces of work contribute to a common parent objective.
Use independent tasks or Task Pool organization instead when activities require separate planning, communication, or management as distinct pieces of work.
Task Stages: Coordinating Sequential Work
Task stages allow a single task to contain multiple sequential portions of work, with each stage assigned to a different team member. A stage represents one turn of work within the overall task.
Unlike subtasks, which break a larger assignment into smaller work items, stages represent a sequence in which one member completes a portion of the work before the next member takes over.
Example of a staged task
Consider a task called Deliver Login Functionality. It might contain the following stages:
- Design login page: A designer prepares the login interface.
- Implement login page: A developer implements the interface and supporting functionality.
- Test login page: A tester verifies the completed functionality.
Creating a task with stages
- Create a task and enter its subject.
- Open its Task Pane.
- Enter the description, assignee, and due date for the first stage.
- Set the verifier responsible for checking the entire task after all stages are completed, if required.
- Click the More button above the task subject.
- Select New Stage.
- Enter the second stage’s subject, description, assignee, and due date.
- Open Stage View from the stage subject.
- Click the + button in the Next Stage area to create the following stage.
- Repeat the process until all required stages have been created.
- Click Back to return to the overall task.
For a task containing stages, the description, assignee, and due date displayed for the initial task represent the first stage rather than a separate overall task description or assignment.
Completing a stage
When the active stage is completed, the assignee selects Complete Stage at the bottom-right of the Task Pane.
This action activates the next stage and assigns the task to the member responsible for that stage. The completed stage becomes inactive, and the next member can begin working.
When all stages are completed, the entire task is considered complete. If a verifier has been assigned, the task then enters the verification workflow.
Viewing stages
Open Stage View to inspect the stages belonging to a task. Use Previous Stage and Next Stage to navigate between stages and select an individual stage to review its details.
Restarting a completed stage
If a completed stage needs rework, navigate to that stage, click More, and select Restart Stage. This makes the stage available for the assigned member to perform again.
Reordering stages
If the sequence of work needs adjustment, navigate to the relevant stage and use the More menu to select Move Before or Move After.
Task Attachments and File Management
Attachments allow members to include supporting files directly in a task. These files may represent deliverables, reference material, specifications, screenshots, documents, or other information needed to complete the work.
Tasifier supports common file types such as Word documents, PDF files, images, and videos, as well as other file formats.
Adding an attachment
- Open the task in the Task Pane.
- Click the More button to the right of the task subject.
- Select Attach from Local Drive.
- Choose the file in the file selection window.
- Confirm the selection.
- Access the uploaded file from the task’s Attachment section.
Viewing attachments
Click an attachment’s filename or preview image to open it. Image and video attachments can be displayed in a popup browser, allowing members to inspect supported content without first downloading it.
Downloading attachments
To download all attachments associated with a task:
- Open the task in the Task Pane.
- Click More above the task subject.
- Select Download All Attachments (zip).
- Wait for the ZIP archive to download.
Deleting attachments
To remove an attachment:
- Open the task.
- Click More above the task subject.
- Select Delete Attachment….
- Locate the file or files to remove.
- Click the delete control beside the relevant attachment.
- Confirm the deletion when prompted.
- Click Done to finish.
Following Tasks and Receiving Notifications
Following a task allows a member to receive notifications when that task is updated, even when the member is not its assignee.
This is useful for project managers, reviewers, stakeholders, or other team members who need to stay informed about a task’s progress.
Following a task
Open the task in the Task Pane and use its Follow function to become a follower.
Unfollowing a task
When a member no longer needs updates, the Follow function can be reversed to stop following the task.
How notifications work
Task notifications are delivered as inbox messages in Tasifier. Followers can use the Inbox to review updates associated with the tasks they follow.
Inbox: Reviewing Task Notifications
The Inbox is the notification area in Tasifier. It displays messages generated by task-related activities and helps members keep track of changes and updates that require their attention.
For example, members may receive notifications associated with tasks they follow or comments and task activities relevant to them.
Select Inbox in the Left Pane to review the available messages. Members can use the inbox to stay informed without manually opening every task in the project.
Searching and Filtering Tasks
Tasifier provides search and filtering capabilities for locating tasks across projects and Task Pools. These capabilities are particularly useful when a project contains a large number of work items.
Searching by task subject
Enter a keyword or part of a task subject in the Search field and press Enter. Tasifier displays tasks whose subjects contain the entered keyword.
For example, searching for login can locate tasks such as:
- Develop the login function.
- Prepare login screen design.
- Write login user guides.
- Test login validation.
Filtering by project
Search results can be limited to selected projects. Use the project selection menu to choose the projects that should be included in the search. Projects can also be removed from the selection.
Filtering by Task Pool
Select one or more Task Pools within a project to narrow the search to specific collections of work.
Filtering by assignee
Use the Assigned to filter to select one or more members. This is useful when reviewing an individual’s responsibilities or finding tasks assigned to a particular team.
Filtering by tag
Select one or more tags to find tasks belonging to specific categories.
Filtering by due period
The Within Due Days filter supports several date-based search options:
- Due within the next N days: Finds tasks expected to become overdue within the specified number of days.
- Due within the last N days: Finds tasks that have become overdue within the specified previous number of days. Completed tasks are also included.
- Due within the period Date X to Date Y: Finds tasks that have become or will become overdue within the specified date range.
Including closed tasks
The Closed Task option allows users to include both open and closed tasks in the search results. This is useful when investigating completed work or reviewing historical activities.
Viewing Other Members’ Tasks and Team Workload
Tasifier allows members to inspect the tasks assigned to other project members. This helps teams understand individual workloads and identify how work is distributed across the project.
Viewing a member’s tasks
- Locate the Members section in the Left Pane.
- Find the member whose workload you want to inspect.
- Select the member’s profile photo.
- Review the tasks displayed in the Main Pane.
Depending on the selected view and permissions, tasks can be examined to understand assignments, deadlines, and outstanding work.
Using workload information
- Identify members with a large number of outstanding tasks.
- Review which tasks are assigned to each person.
- Identify tasks that may need reassignment.
- Balance new assignments against existing workloads.
- Monitor completed work and ongoing activities.
Task Reporting and Workload Analysis
Tasifier provides reporting support for examining the workload and activity of project members. Reports can help managers determine how work is distributed and make more informed assignment decisions.
Generating a task report
- Select the project in the Left Pane.
- In the Main Pane, click the down arrow beside the project name.
- Select Report.
- Specify the reporting criteria.
- Click Generate to produce the report.
Report criteria
| Criterion | Description |
|---|---|
| Day range | Specifies the date range covered by the report. |
| Scope | Defines the project and Task Pool included in the report. |
| Member involved | Specifies the team member whose workload or activity is being inspected. |
| Data | Specifies the task activity categories to include. |
Task activity categories
- New: Tasks newly assigned to the selected member within the specified date range.
- Processed: Tasks to which the selected member has replied within the specified date range.
- Completed: Tasks completed by the selected member within the specified date range.
- Closed: Tasks closed by the selected member within the specified date range.
- Outstanding: Overdue tasks that remain open within the specified date range.
Task reports and statistical reports
A generated task report lists the relevant tasks by category. Users can select an individual task in the report to open its details.
When the objective is to examine statistics rather than individual task records, use Generate (Statistic) instead.
Integration with Visual Paradigm Modeling and Development Workflows
One of Tasifier’s key advantages is its integration with Visual Paradigm’s modeling environment. Rather than managing development tasks separately from the models and artifacts that describe the system, teams can coordinate both activities within the same working environment.
Use cases and Task Pools
When Tasifier is running inside Visual Paradigm, development tasks can be planned around use cases. This allows teams to organize the activities needed to implement or support individual use cases and monitor their progress.
For example, a use case called Register Customer could be supported by activities such as:
- Analyze registration requirements.
- Design the registration interface.
- Implement registration services.
- Integrate database operations.
- Test the registration workflow.
These activities can be organized into Task Pools and managed through Tasifier.
Attaching diagrams to task comments
Visual Paradigm users can attach diagrams when commenting on tasks. This enables a team member to provide a visual explanation or design reference as part of a task discussion.
This capability is useful when a developer needs clarification about a model, a designer wants to explain a proposed change, or a reviewer needs to provide visual feedback.
Attaching Teamwork Files to task comments
Teamwork Files can also be attached to task comments. This connects task discussions with project-related files stored in the Visual Paradigm collaboration environment.
Keeping development activities aligned
Tasifier supports workflows that bring different representations of development work together. Visual Paradigm’s task management capabilities can be used in conjunction with user stories, PERT tasks, and Enterprise Architecture activities, reducing the need to manage equivalent work information independently across multiple tools.
Gantt Chart View and Task Synchronization
Tasifier supports a Gantt chart perspective for viewing project tasks and their schedules. A Gantt chart presents activities along a timeline, helping stakeholders understand when tasks are scheduled and how the work fits into the overall project plan.
Understanding the Gantt chart view
The Gantt chart provides a visual representation of task start and end dates. It helps project members review scheduling information and understand the timing and relationships between activities.
Round-trip synchronization
Tasifier supports round-trip synchronization between its task management view and the Gantt chart. Changes made in either view can be reflected in the other, helping teams maintain consistent task information across different ways of examining the project.
Why synchronize task information?
- Use the task list for detailed task management and assignment.
- Use the Gantt chart to understand the project timeline.
- Review scheduling information from a visual perspective.
- Keep task information aligned when updates are made through the supported synchronized views.
The Gantt chart and Tasifier serve complementary purposes: the task list supports day-to-day work management, while the Gantt chart provides a timeline-oriented view of project activities.
Practical Workflow: Managing a Software Development Project with Tasifier
The following example illustrates how a team can use Tasifier to organize and manage the work required to develop a software feature.
Step 1: Prepare the collaboration project
Ensure that the project is available in VPository or Visual Paradigm Teamwork Server, that Tasifier is enabled, and that the relevant team members have access.
Step 2: Open Tasifier
Open the project in Visual Paradigm Desktop and select Team > Tasifier.
Step 3: Create Task Pools
Create logical Task Pools for the main development activities, such as Requirements Analysis, UI Design, Implementation, and Testing.
Step 4: Plan the tasks
Create tasks within the relevant Task Pools. Give each task a clear subject and add descriptions explaining the expected work and deliverables.
Step 5: Assign responsibilities
Assign each task to the appropriate team member. Set due dates and designate verifiers for work that requires review.
Step 6: Kick off the Task Pools
After reviewing the planned work and assignments, kick off the Task Pools so that assigned members can begin working on their tasks.
Step 7: Execute and prioritize tasks
Team members review My Tasks and move their work between New, To Do, and Pending according to their priorities and schedules.
Step 8: Collaborate through comments and attachments
Members post comments to communicate progress, ask questions, report problems, and provide feedback. They can attach files, diagrams, and Teamwork Files when additional supporting information is required.
Step 9: Break down complex activities
Use subtasks to divide large assignments into smaller work items. Use stages when a task requires sequential participation by different team members.
Step 10: Monitor deadlines and workloads
Review the Overdue section, inspect individual members’ tasks, and generate workload reports to understand the project’s progress and identify activities that need attention.
Step 11: Complete and verify work
Members complete their assigned tasks or stages. Tasks with verifiers proceed through the verification workflow, while tasks without verifiers are closed automatically upon completion.
Step 12: Close completed Task Pools
When the work associated with a Task Pool is finished, move it to the Closed status. Its tasks then remain available in read-only form for reference.
Common Tasifier Questions and Troubleshooting
Why is the Tasifier command disabled in Visual Paradigm Desktop?
The Tasifier command may be disabled when Visual Paradigm Desktop does not have an active connection to VPository or a supported corporate edition of Visual Paradigm Teamwork Server, or when the currently opened project does not have Tasifier enabled. Verify the collaboration connection and project configuration.
Why can I not see tasks assigned to me?
Check whether you are viewing the correct project and whether the task is assigned to your account. If the task belongs to a Task Pool that is still in Planning status, it will not yet appear in your My Tasks list. The Task Pool must be kicked off before its assigned tasks become visible there.
Why can I not create a task inside a Task Pool?
Check the Task Pool’s current status. Tasks can be created in Task Pools that permit planning or active work, but a Closed Task Pool is read-only and does not allow new tasks to be added.
Why is a completed task still waiting for someone?
The task may have a verifier assigned. When a task is completed, it is sent to the verifier’s My Tasks list for verification rather than being closed immediately.
Why was my task closed immediately after completion?
If no verifier has been designated, Tasifier closes the task automatically when it is completed.
Can I create tasks without using a Task Pool?
Yes. Tasks can be created directly in My Tasks or under a project without belonging to a Task Pool. Personal tasks created in My Tasks do not initially belong to a Task Pool, but they can be moved into one later.
Can I assign a task to another member after creating it?
Yes. Open the task and change its assignee through the Task Pane, or select one or more tasks and drag them to another member’s profile photo in the Left Pane.
Can I move a task to another project?
Yes. Open the task’s Task Pane, click the arrow beside its Task Pool name, and select Change project to move it to a Task Pool in another project.
What is the difference between a subtask and a stage?
A subtask is a smaller work item under a parent task. A stage is a sequential portion of work within one task, typically assigned to a different member. Subtasks represent work breakdown, while stages represent sequential handover.
Can multiple people follow the same task?
Task following allows members to subscribe to updates. Each member can follow or unfollow a task according to their need to receive notifications.
Where do task notifications appear?
Task notifications are delivered as messages in the Tasifier Inbox.
Can I attach Visual Paradigm diagrams to tasks?
Yes. When Tasifier is running inside Visual Paradigm, diagrams can be attached to task comments to provide visual references for discussions and feedback.
Can I attach files from a Visual Paradigm project?
Yes. Teamwork Files can be attached to task comments. Recipients can access the latest revision of an attached Teamwork File, provided that the file exists in their project.
Can I use Tasifier without Visual Paradigm Desktop?
Yes. Tasifier also provides a web interface, allowing project members to access and manage tasks through a web browser. The desktop application is not required for every task management activity.
Does Tasifier support reporting?
Yes. Tasifier provides project workload reports that categorize tasks as New, Processed, Completed, Closed, and Outstanding. It also supports generating statistical reports.
Can I use Tasifier to manage recurring tasks?
Yes. The Repeat option in the due-date settings supports recurring tasks. For example, a daily recurring task creates another task one day after the current task is completed.
Does closing a Task Pool delete its tasks?
No. Closing a Task Pool makes the Task Pool and its tasks read-only. It does not mean that the tasks are deleted.
Can Task Pool statuses be customized?
Yes. Members with the required permission can define additional statuses, entry conditions, and status attributes. The status configuration is shared among projects.
Frequently Asked Questions About Tasifier
What is Tasifier in Visual Paradigm?
Tasifier is Visual Paradigm’s collaborative task management tool for software development teams. It supports task planning, assignment, categorization, prioritization, progress monitoring, comments, attachments, and team workload management.
Is Tasifier included in Visual Paradigm Desktop?
Tasifier is accessible from Visual Paradigm Desktop through Team > Tasifier when the application is connected to a supported collaboration environment and the current project has Tasifier enabled. The Team Collaboration edition comparison lists collaboration capabilities across the Enterprise, Professional, Standard, Modeler, and Community editions, but service and project requirements must also be met.
Is Tasifier a standalone desktop application?
No. Tasifier is an integrated collaboration feature that works with Visual Paradigm’s collaboration environment. It can be accessed from Visual Paradigm Desktop or through a web browser.
Does Tasifier require an internet connection?
Accessing Tasifier requires a working connection to the configured collaboration environment. For VPository, this normally means access to the hosted service. For Teamwork Server, it means access to the organization’s configured server.
What is the difference between a project and a Task Pool?
A project is the primary workspace for development activities and members. A Task Pool is a logical collection of related tasks within that project.
What is the difference between a Task Pool and My Tasks?
A Task Pool organizes work according to a project objective or workstream. My Tasks organizes work according to the member responsible for completing it.
What are the three My Tasks lists?
New contains recently received tasks, To Do contains tasks to be tackled soon, and Pending contains tasks that will be handled later.
What happens when a Task Pool is kicked off?
Kicking off a Task Pool starts its work phase and makes assigned tasks visible in the assignees’ My Tasks lists.
What happens when a Task Pool is closed?
A closed Task Pool and its tasks become read-only. Members cannot add or remove tasks, edit task information, or post comments.
What does a task verifier do?
A verifier reviews a task after its assignee completes the work. The task appears in the verifier’s My Tasks list pending verification.
What happens if a task has no verifier?
The task is automatically closed after completion.
Can Tasifier handle tasks involving multiple team members?
Yes. A task can contain multiple sequential stages, each assigned to a different team member. Completing one stage activates the next stage.
Can Tasifier manage a large task through smaller tasks?
Yes. Subtasks allow users to break down a parent task into smaller units of work, each with its own task details.
How does Tasifier notify team members?
Members who follow tasks receive update notifications through their Tasifier Inbox.
Can Tasifier track overdue work?
Yes. Tasifier supports due dates, overdue task views, upcoming deadline reviews, and date-based task search filters.
Can Tasifier integrate task management with Gantt charts?
Yes. Tasifier supports a Gantt chart view and round-trip synchronization between task information and the Gantt chart, helping teams maintain consistent scheduling information.
Can Tasifier be used for Agile development?
Yes. Task Pools can be organized around iterations, features, or development workstreams. Teams can use My Tasks, tags, assignments, and staged workflows to coordinate development activities.
Can Tasifier manage work associated with UML use cases?
Yes. When used inside Visual Paradigm, Tasifier supports planning development tasks based on use cases and monitoring the progress of the activities supporting those use cases.
Summary
Tasifier brings collaborative task management into the Visual Paradigm development environment. It enables software development teams to organize work into projects and Task Pools, create and assign tasks, prioritize responsibilities, monitor deadlines, manage verification, communicate through comments, and share supporting files.
Its more advanced capabilities, including subtasks, sequential task stages, configurable Task Pool statuses, workload reporting, Gantt chart synchronization, and integration with Visual Paradigm diagrams and Teamwork Files, make it suitable for coordinating development activities beyond simple personal task tracking.
By connecting task management with the models, artifacts, and people involved in software development, Tasifier helps teams maintain a more structured and collaborative approach to planning and delivering software projects.
VISUAL PARADIGM
Comments and Team Collaboration
Comments provide a communication channel attached directly to a task. Members can use comments to ask questions, explain progress, report problems, request changes, or provide feedback.
Unlike general email discussions, task comments remain associated with the relevant work item, making it easier for other members to understand the discussion in context.
Adding a comment
Replying to comments
Members can respond to comments posted by other team members, allowing discussions to develop around individual tasks.
Attaching files to comments
Comments can include supplementary files. Multiple files can be attached to a comment when additional material is needed to explain a question, issue, or progress update.
Attaching Visual Paradigm diagrams to comments
When Tasifier is running inside Visual Paradigm Desktop, members can attach diagrams when posting comments. This is particularly useful when discussing a design decision, explaining an implementation issue, or providing a visual reference for a requested change.
Attaching Teamwork Files to comments
Visual Paradigm also supports attaching Teamwork Files to task comments. Teamwork Files are project-related files stored with Visual Paradigm projects and can maintain revisions.
To attach a Teamwork File:
Members viewing the comment inside Visual Paradigm can use the file link to download the latest revision of the attached Teamwork File, provided that the file exists in their project.