What Is Just-in-Time Project Management?
Just-in-Time (JIT) Project Management is a process-based project management tool in Visual Paradigm Desktop that allows teams to plan and perform project management activities incrementally, introducing the work items and deliverables they need when they need them.
Instead of requiring teams to define and complete an extensive management process before project work begins, the tool provides an actionable two-dimensional process map containing reusable activities, instructions, forms, and project management resources. Teams can adopt a predefined process, customize it, or gradually extend it as the project evolves.
The central concept is just-in-time, just-enough project management: perform the management activities that are appropriate for the project’s current circumstances without introducing unnecessary procedures and documentation.
Visual Paradigm provides ready-to-use project management templates, including PMBOK-based activities, reusable work items, form-based data collection, document generation, and a visual repository for managing project deliverables.
Why Use Just-in-Time Project Management?
Traditional project management approaches can introduce substantial planning and documentation overhead, particularly when teams apply the same extensive procedures to projects with very different levels of complexity. Just-in-Time Project Management helps teams maintain appropriate management discipline while avoiding unnecessary work.
Reduce unnecessary project management overhead
Not every project needs the same number of plans, registers, reviews, and management activities. A small internal project may not require the same level of documentation as a large enterprise implementation. JIT project management allows teams to select an appropriate process and include only the activities that are useful for their circumstances.
Start working without designing everything upfront
Teams can begin with a basic process map and add activities as new requirements, risks, stakeholders, or management needs emerge. This reduces the effort spent designing a complete process before the team understands what the project will actually require.
Maintain consistency across project activities
Reusable work items provide consistent instructions, forms, examples, and expected outcomes. Team members can follow the same guidance when preparing project documents, conducting analyses, or recording management information.
Reduce the effort required to produce project documents
Information collected through work items can be consolidated into formatted project management deliverables. Instead of repeatedly preparing documents from scratch, teams can use predefined templates and automatically generated deliverables.
Make project knowledge easier to retain
Generated deliverables are archived in a visual Project Management Repository, also described as a visual File Cabinet. This provides a central place to access project management records and completed documentation.
Support collaboration and flexible execution
Work items can be performed in sequence or in parallel, depending on project requirements. Teams can also associate tasks with process activities through the supported task management integration.
What happens without a structured JIT process?
- Project management activities may be performed inconsistently by different team members.
- Teams may spend time creating documents and forms that already exist as reusable resources.
- Important project information may be scattered across unrelated files and locations.
- Documentation may be duplicated because information is repeatedly entered into different reports.
- Teams may follow unnecessarily complicated procedures for relatively simple projects.
- New project requirements may result in ad hoc process changes that are difficult to communicate and maintain.
Edition Availability and Licensing
Visual Paradigm’s Just-in-Time Project Management templates are available in the Enterprise and Professional editions of Visual Paradigm Desktop, according to the published edition comparison.
| Capability | Enterprise | Professional | Standard | Modeler | Community |
|---|---|---|---|---|---|
| Just-in-Time Project Management Templates | Yes | Yes | No | No | No |
| PMBOK Just-in-Time Templates | Yes | Yes | No | No | No |
| Just-in-Time Process Map Customization | Yes | Yes | No | No | No |
| Process Map Editor | Yes | Yes | No | No | No |
| Work Item Composer | Yes | Yes | No | No | No |
Important distinction: The predefined Just-in-Time Project Management templates and the customization tools are separately identified in the edition comparison. The general Just-in-Time Process Map capability, which covers broader process design and execution, is listed separately and has different edition availability. Users should consult the current edition comparison for the exact capabilities included in their license.
For the latest licensing information, refer to the Visual Paradigm Edition Comparison.
How Just-in-Time Project Management Works
The tool organizes project management activities into a visual process map. Each activity is represented by an actionable work item that guides team members through the required work.
The typical workflow consists of the following stages:
- Select a project management process: Start with a predefined project management or PMBOK process template appropriate for the project.
- Configure the process: Add, remove, or rearrange activities to reflect the project’s actual management requirements.
- Execute work items: Open individual activities and follow their instructions, examples, forms, and integrated tools.
- Collect project information: Record relevant information through forms, diagrams, analysis tools, and other work item resources.
- Develop deliverables: Generate project management documents from the information collected through the process.
- Archive project records: Store completed deliverables in the visual Project Management Repository for future access.
- Adapt the process: Introduce additional activities or remove unnecessary ones as the project progresses.
This approach allows the project management process and its documentation to evolve together rather than requiring all management activities to be completed at the beginning.
Just-in-Time Project Management Functionality Breakdown
Visual Paradigm combines several capabilities to support the complete project management workflow, from process configuration and activity execution to document generation and archiving.
Actionable Project Management Process Map
The process map is the central workspace for organizing and executing project management activities. It presents work items in a two-dimensional visual arrangement, allowing team members to understand the activities that make up the project’s management process.
Unlike a conventional project management checklist, the process map contains actionable work items. Each item provides resources and guidance for performing a specific management activity.
Depending on the selected template, the map can organize activities around project phases, process groups, or other meaningful categories.
Typical project management phases include:
- Identification
- Initiation
- Planning
- Execution and Control
- Closeout
Teams can use the map to understand which management activities are available, select the work they need to perform, and access the corresponding work item resources.
Flexible Process Configuration
Just-in-Time Project Management supports process tailoring. Teams are not required to follow every activity in a predefined template without modification.
Using the process configuration capabilities, teams can:
- Add work items to include additional management activities.
- Remove work items that are unnecessary for the project.
- Rearrange activities to reflect the preferred working approach.
- Combine reusable work items from different process resources.
- Extend an existing process as new management requirements emerge.
Process configuration is particularly useful when an organization follows a recognized framework but needs to adapt its procedures to its own operating environment.
For example, a team using a PMBOK-based process may introduce additional stakeholder review activities, organization-specific approval steps, or specialized project registers.
Incremental and Just-in-Time Execution
The defining characteristic of the JIT approach is that project management activities can be introduced and performed progressively.
Teams can begin with the activities needed at the beginning of a project and expand the process when additional work becomes necessary. They do not have to complete every activity in the map before starting project execution.
This approach supports several execution patterns:
- Sequential execution: Perform activities one after another when a later activity depends on an earlier result.
- Parallel execution: Work on independent activities simultaneously when appropriate.
- Selective execution: Skip activities that are not relevant to the project.
- Progressive extension: Add activities when new requirements or circumstances justify them.
For example, a team may initially prepare a project charter and stakeholder information. When planning becomes necessary, the team can introduce a work breakdown structure, project schedule, resource plan, and risk register.
Just-in-Time execution does not mean abandoning project controls. It means applying an appropriate level of management discipline at the appropriate time.
Four Project Complexity Schemes
Visual Paradigm provides four predefined project management process schemes to accommodate projects with different levels of complexity.
- High Complexity: Provides a more comprehensive set of management activities and deliverables for projects requiring extensive planning, coordination, and control.
- Medium Complexity: Offers a balanced set of project management activities for projects with moderate management requirements.
- Low Complexity: Provides a more streamlined process for relatively straightforward projects.
- Basic Complexity: Offers a lightweight starting point for projects requiring only essential management activities.
These schemes help teams avoid applying an unnecessarily extensive management process to projects that do not need it.
The selected scheme serves as a starting point rather than an unchangeable restriction. Teams can further tailor the process to reflect their actual requirements.
Reusable Project Management Work Items
Work items are the actionable building blocks of a Just-in-Time process map. Each work item represents a specific project management activity or supporting resource.
A work item may provide instructions, forms, examples, diagrams, analysis tools, or other resources required to complete the activity.
Work items generally support two important purposes:
- Data collection: Capture project information through structured forms and other information-gathering resources.
- Problem analysis: Help teams investigate issues, assess situations, and perform the analysis needed to support project decisions.
Instead of treating each activity as an isolated task, the work item provides a consistent environment for performing the activity and producing its associated outputs.
Form-Based Project Data Collection
Many project management activities require teams to collect and maintain structured information. Visual Paradigm provides form-based work items that allow team members to enter project information in predefined formats.
Examples include:
- Project Charter
- Project Proposal
- Project Complexity Assessment
- Risk Assessment
- Issue Log
- Risk Register
- Lessons Learned Report
- Project Closeout Report
These forms help standardize information collection and reduce the need to create individual documents manually.
Work items can also incorporate instructions and examples to help users understand what information should be entered and how the expected result should look.
Work Items for Analysis and Decision Support
Not every project management activity involves filling in a form. Some activities require the team to investigate a problem, analyze relationships, or develop a structured understanding of a project situation.
Visual Paradigm supports work items that incorporate diagrams, analytical resources, and other tools for these purposes.
Examples of possible applications include:
- Analyzing project risks and their potential impact.
- Examining project scope and decomposing work into manageable components.
- Investigating project issues and dependencies.
- Evaluating project alternatives and constraints.
- Documenting decisions and supporting project planning.
These resources allow teams to perform analysis within the same overall process environment used for other project management activities.
PMBOK and TOGAF Work Item Integration
Visual Paradigm provides predefined work items covering established frameworks and general project management practices. Teams can reuse these resources instead of developing every activity and form independently.
PMBOK: Teams can use PMBOK-oriented work items and process templates to support project management activities such as initiation, planning, execution, monitoring and controlling, and closing.
TOGAF: Relevant TOGAF ADM work items can be incorporated into processes where enterprise architecture activities and deliverables are required.
Teams can select, combine, and reuse appropriate work items to create a process that reflects their own project management needs.
This is especially useful for organizations that follow multiple standards or frameworks but want to maintain a unified working process.
Step-by-Step Instructions and Samples
Work items include guidance to help team members understand how to perform the associated activities.
Instructions explain the actions to take, while samples demonstrate the expected type of information or outcome.
This built-in guidance helps:
- Reduce the learning curve for unfamiliar project management activities.
- Improve consistency between different team members.
- Reduce dependence on external documentation and training materials.
- Help less experienced team members understand what they need to produce.
- Make established project management practices easier to adopt.
Users can consult the instructions and examples while performing the work, rather than having to search for separate guidance.
Custom Diagrams and Text-Based Work Items
Project management sometimes requires information that cannot be adequately represented using predefined forms. Teams may need additional diagrams, explanatory documents, specialized analysis, or project-specific records.
Visual Paradigm provides reusable work item resources for incorporating diagrams and text into a Just-in-Time process map.
Teams can select the appropriate resources from the available gallery and add them to their process. This allows the process to support both structured data collection and more flexible documentation activities.
For example, a project may require additional workflow diagrams, organizational information, technical documentation, or explanatory text as part of its management activities.
Automatic Project Deliverable Generation
One of the most valuable capabilities of Just-in-Time Project Management is its ability to generate project management deliverables from information collected through work items.
As team members complete forms and other activities, the collected information can be consolidated into formatted project management documents using predefined deliverable templates.
This reduces the effort required to prepare documents manually and helps maintain consistency between the information collected during project execution and the resulting deliverables.
Examples of project deliverables include:
| Project Phase | Example Deliverables |
|---|---|
| Identification | Project Proposal, Cost Benefit Analysis, Risk Assessment, Project Complexity Assessment |
| Initiation | Project Charter, Project Complexity Assessment |
| Planning | Work Breakdown Structure, Project Schedule, Resource Plan, Staffing Plan, Budget Plan, Project Plan, Risk Register, Communications Plan, Procurement Plan, Quality and IV&V Plan |
| Execution and Control | Status Report, Meeting Agenda, Procurement Log, Risk Register, Issues Log, Change Control Request, Change Request Log, User Acceptance Report |
| Closeout | Lessons Learned, Project Closeout Report |
The exact deliverables available depend on the selected process template and the work items included in the process.
Deliverables can be generated using predefined templates. Visual Paradigm also provides the Just-in-Time Doc. Composer for designing customized deliverable documents.
Automatic Deliverable Archiving and Project Management Repository
Generated project management deliverables are automatically classified and archived in the visual Project Management Repository, also described as a visual File Cabinet.
The repository provides a centralized location for accessing project management documentation produced through the process.
Its key benefits include:
- Centralized access to generated project deliverables.
- Organized storage of project management documents.
- Reduced manual effort in maintaining separate document collections.
- Improved accessibility of completed project records.
- Support for retaining project information for future reference.
Teams can also add files to the repository manually, allowing supporting materials to be maintained alongside automatically generated deliverables.
Task Management for Project Activities
Project management work items can be associated with tasks through Visual Paradigm’s supported task management integration with Tasifier.
This allows teams to turn process activities into assigned work and coordinate execution with other team members.
Task management integration is useful when:
- A work item needs to be assigned to a particular team member.
- An activity requires coordination between multiple people.
- Project management work needs to be tracked as actionable tasks.
- Teams want to coordinate process activities through a task management platform.
The process map provides the management context, while task management helps coordinate the actual execution of assigned activities.
Advanced Process Customization Tools
Visual Paradigm also provides dedicated customization capabilities for organizations that need to develop their own Just-in-Time processes and reusable work items.
These capabilities include the Process Map Editor and Work Item Composer.
Process Map Editor
The Process Map Editor supports the design and customization of Just-in-Time process maps. It allows process designers to organize the map and tailor its contents to the organization’s preferred workflow.
Typical customization activities include adjusting process organization, adding or removing work items, and adapting the process to project-specific requirements.
Work Item Composer
The Work Item Composer allows users to develop reusable work items for inclusion in Just-in-Time processes.
Organizations can use it to define activities that are not adequately covered by existing templates, such as specialized stakeholder meetings, domain-specific analysis, budget planning, or additional project documentation.
Work item composition supports:
- Defining steps: Break an activity into individual steps that guide users through the required work.
- Writing instructions: Explain the actions that users should perform at each step.
- Including samples: Provide examples to demonstrate expected results.
- Designing forms: Create structured forms incorporating tables, instructions, diagrams, and other content.
- Reusable work items: Make completed work items available in the gallery for reuse in other processes.
- Deliverable management: Associate deliverables with repository drawers to support automatic archiving.
These customization tools help organizations move beyond using predefined templates and establish reusable project management processes that reflect their own working practices.
How to Use Just-in-Time Project Management in Visual Paradigm Desktop
The following workflow describes a practical way to start using the Just-in-Time Project Management tool and manage a project incrementally.
Step 1: Choose a Project Management Process Template
Start by selecting an appropriate predefined Just-in-Time project management process template.
Consider the size, complexity, risk, and management requirements of your project. Choose an appropriate complexity scheme or start with a process template that most closely matches your needs.
You can use a predefined project management template or a PMBOK-oriented process as the foundation for your work.
Step 2: Review the Process Map
Examine the available phases, categories, and work items in the process map.
Identify the activities that are immediately necessary and those that can be introduced later.
For example, a newly initiated project may initially require:
- Project proposal
- Project charter
- Initial stakeholder information
- Project complexity assessment
- Initial risk assessment
There is no need to complete every planning and execution activity immediately.
Step 3: Tailor the Process to Your Project
Review the predefined activities and adapt the process to reflect your project requirements.
Add relevant work items, remove unnecessary activities, and rearrange the process where appropriate.
For example, a software implementation project may require additional requirements analysis and technical review activities, while a smaller internal project may need a simpler management process.
The objective is to create a process that provides sufficient management guidance without introducing unnecessary overhead.
Step 4: Open and Execute Work Items
Select a work item that needs to be completed and follow its instructions.
Depending on the work item, you may be required to:
- Read the instructions for the activity.
- Review the supplied examples.
- Complete a predefined form.
- Create or update a diagram.
- Perform an analysis.
- Record the outcome of the activity.
Use the resources provided by the work item to complete the activity consistently and produce the expected information.
Step 5: Generate Project Management Deliverables
After collecting the required information, generate the associated project management deliverables using the available document generation facilities.
Use the predefined deliverable templates for standard documents or the Just-in-Time Doc. Composer when customized document layouts are required.
Review the generated documents to ensure that the information is complete and appropriate for the project.
Step 6: Review the Project Management Repository
Access the visual Project Management Repository to find the deliverables generated from completed work items.
Check that the expected documents have been generated and archived. Add supporting project files manually where necessary.
This helps maintain a central collection of project management records.
Step 7: Extend the Process as the Project Evolves
As the project moves into new phases, revisit the process map and identify additional activities that are now necessary.
For example:
- When planning begins, introduce work breakdown structures, schedules, resource plans, and budget plans.
- When execution starts, introduce status reporting, meeting records, and issue management activities.
- When project changes occur, introduce change control and change request management activities.
- When the project approaches completion, introduce acceptance, lessons learned, and closeout activities.
Continue adapting the process so that the project receives the management support it needs at each stage.
Practical Example: Managing a Software Development Project
Consider a team developing a new business application. The project has a limited initial scope, but its requirements and delivery needs may evolve as the team works with stakeholders.
Using Just-in-Time Project Management, the team can organize its work progressively.
Initial identification and initiation
The team starts with the essential activities needed to establish the project.
- Prepare a project proposal.
- Assess the project’s complexity.
- Perform an initial risk assessment.
- Prepare the project charter.
Planning
When the project scope becomes clearer, the team introduces the planning activities required to organize delivery.
- Develop a Work Breakdown Structure.
- Prepare the project schedule.
- Identify resource requirements.
- Develop a budget plan.
- Maintain a risk register.
- Prepare a communications plan.
Execution and control
During development, the team introduces activities to monitor progress and manage changes.
- Prepare project status reports.
- Record meeting outcomes.
- Maintain an issue log.
- Track risks and mitigation activities.
- Manage change requests.
- Record user acceptance information.
Project closeout
When the application is ready for completion, the team introduces the activities needed to close the project.
- Prepare the lessons learned report.
- Complete the project closeout report.
- Review and retain the project deliverables.
Throughout the project, the team uses work item instructions and forms to collect information, generates documents from the collected data, and maintains the resulting deliverables in the Project Management Repository.
This example demonstrates how the process can grow with the project instead of requiring every management activity to be established and completed at the beginning.
Best Practices for Using Just-in-Time Project Management
Choose the right level of process complexity
Begin with a complexity scheme that reasonably reflects the project’s scale and risk. Avoid selecting an extensive process simply because it contains more activities.
Keep the process focused on actual project needs
Include activities that provide meaningful management value. Remove unnecessary activities, but retain essential controls for scope, quality, cost, schedule, risk, and stakeholder management where applicable.
Use predefined work items before creating new ones
Explore the available gallery and templates before developing custom work items. Reusing existing resources reduces development effort and helps maintain consistency.
Provide clear instructions for custom activities
When creating custom work items, define their purpose, required steps, instructions, and expected outputs. Include examples wherever possible.
Maintain deliverable quality
Automatic document generation reduces manual work, but teams should still review generated documents for completeness, accuracy, and suitability before using them as formal project records.
Review and adapt the process regularly
Project requirements change. Periodically review the process map to identify activities that should be introduced, modified, or removed.
Keep project documentation organized
Use the Project Management Repository as the central location for generated deliverables and relevant supporting records. This makes it easier for team members to locate project information.
Common Misconceptions and Important Distinctions
Is Just-in-Time Project Management the same as having no project management process?
No. Just-in-Time Project Management provides a structured process map and reusable work items. It allows teams to tailor and progressively execute the process rather than requiring them to perform every predefined activity.
Does just-in-time mean that project activities are automatically selected by artificial intelligence?
No. The defining approach is incremental process configuration and execution. Teams decide which activities are relevant and when they should be introduced. It should not be confused with an AI-driven system that automatically predicts and selects the next project activity.
Is the process map just a project schedule?
No. A process map organizes project management activities and their associated work items. Its purpose is to guide the execution of management processes and the production of deliverables. It is different from a conventional schedule that primarily represents activities against dates and durations.
Does every work item represent a task assigned to an individual?
No. A work item is a reusable process building block representing an activity or resource. It may contain forms, instructions, examples, diagrams, and other tools. Work items can be associated with tasks through the supported Tasifier integration, but the concepts are not identical.
Does completing a work item automatically generate every project document?
No. Deliverable generation depends on the work item and its associated deliverable templates. The information collected through supported work items can be used to generate their associated deliverables.
Can teams use only selected activities from a predefined process?
Yes. The process is configurable. Teams can select relevant work items, skip activities that are unnecessary, and introduce additional activities as the project progresses.
Can a team combine PMBOK and TOGAF work items?
Yes. The Just-in-Time approach supports selecting and combining reusable work items from different available process resources, including PMBOK and TOGAF-oriented activities, where appropriate.
Can organizations create their own project management work items?
Yes. Visual Paradigm provides the Work Item Composer for developing reusable work items. This capability allows organizations to define their own steps, instructions, samples, and forms for use in customized processes.
Are project deliverables stored automatically?
Supported generated deliverables are automatically archived in the visual Project Management Repository. Additional supporting files can also be added manually.
Can a Just-in-Time process be customized after a project has started?
Yes. Process tailoring is an important part of the JIT approach. Teams can adjust the process as new project requirements emerge, subject to the available process customization capabilities and their edition.
Frequently Asked Questions
What is the Just-in-Time Project Management tool in Visual Paradigm?
It is a project management tool that provides a configurable process map containing actionable work items, instructions, forms, and document generation capabilities. It enables teams to perform project management activities incrementally and produce deliverables when needed.
What does just-in-time, just-enough project management mean?
It means performing the project management activities that are appropriate for the project’s current needs, rather than implementing every possible management procedure upfront. Teams can add activities as the project evolves.
Which Visual Paradigm editions support Just-in-Time Project Management?
The published edition comparison lists Just-in-Time Project Management Templates in Enterprise and Professional editions. Standard, Modeler, and Community editions do not list this feature.
What is the difference between Just-in-Time Project Management and PMBOK Just-in-Time Templates?
Just-in-Time Project Management is the broader approach to organizing and executing a tailored project management process. PMBOK Just-in-Time Templates provide predefined work items and process resources based on PMBOK practices that can be used within that approach.
What is a Just-in-Time process map?
A Just-in-Time process map is a two-dimensional visual workspace containing actionable work items organized into a process structure. It allows teams to select, execute, and tailor activities as project requirements evolve.
What are work items in Just-in-Time Project Management?
Work items are reusable building blocks representing project management activities or resources. They can provide forms, instructions, examples, diagrams, analysis tools, and other materials needed to complete an activity.
What are the four project complexity schemes?
Visual Paradigm provides High Complexity, Medium Complexity, Low Complexity, and Basic Complexity schemes. These offer different starting levels of project management activities to accommodate projects with different management requirements.
Can I add or remove activities from the project management process?
Yes. The process is customizable. You can add relevant work items, remove unnecessary activities, and rearrange the process to suit your project.
Can I execute project management activities in parallel?
Yes. The process supports performing activities in sequence or in parallel, depending on their dependencies and the team’s working requirements.
What kinds of project management forms are available?
Examples include project charters, project proposals, project complexity assessments, risk assessments, issue logs, risk registers, and lessons learned reports.
Does Visual Paradigm automatically generate project management reports?
Yes. Information collected through supported work items can be consolidated into formatted project management deliverables using predefined templates or customized document designs.
Where are generated project management documents stored?
They are automatically archived in the visual Project Management Repository, also known as a visual File Cabinet, where users can access the generated deliverables.
Can I manually add files to the Project Management Repository?
Yes. In addition to automatically generated deliverables, users can manually place supporting files in the repository.
What is the Just-in-Time Doc. Composer?
The Just-in-Time Doc. Composer is a document composition facility that allows users to design customized project management deliverable documents instead of relying exclusively on predefined document templates.
What is the Work Item Composer?
The Work Item Composer is a customization tool for creating reusable Just-in-Time work items. It supports defining steps, instructions, samples, and forms that can be reused in process maps.
What is the Process Map Editor?
The Process Map Editor is a tool for designing and customizing Just-in-Time process maps. It helps process designers organize activities and tailor process structures to their requirements.
Can I create a project-specific process instead of following PMBOK?
Yes. Just-in-Time Project Management is not limited to following a single framework. Teams can customize an existing template or develop a process that reflects their own project management practices.
Does Just-in-Time Project Management support task assignment?
Yes. Work items can be associated with tasks through the supported Tasifier task management integration, allowing teams to coordinate and assign process activities.
Is Just-in-Time Project Management suitable for small projects?
Yes. Its complexity schemes and configurable process map allow teams to use a lightweight set of management activities for relatively simple projects.
Is Just-in-Time Project Management suitable for enterprise projects?
Yes. Teams can use more comprehensive process schemes, combine framework-based work items, customize activities, and maintain generated project deliverables in a centralized repository.
Does the tool replace dedicated project scheduling software?
No. Its primary purpose is to organize and guide project management processes and deliverable development. It complements scheduling, task management, diagramming, and other project management tools rather than replacing every specialized project management function.
Summary
Visual Paradigm Desktop’s Just-in-Time Project Management tool provides a flexible and structured way to manage project activities and develop project documentation incrementally.
Through actionable process maps, reusable work items, complexity-based process schemes, predefined forms, framework-based resources, document generation, and automatic deliverable archiving, teams can establish a project management approach that fits their actual needs.
Rather than imposing a fixed and exhaustive management process, the JIT approach allows organizations to start with an appropriate foundation and extend it as their projects evolve. The result is a more adaptable project management process that balances management discipline with efficiency.